15
UAB KOMFOVENT we reserve the right to make changes without prior notice
C6M_GUIDE2-19-04
To create a weekly operation schedule:
1. Select a weekly schedule “My week” as shown in Chapter “Mode Change”.
2. Press the centre of the schedule window and hold for 5 seconds.
3. Press the weekday row to select which days of the week this schedule sheet is valid for.
4. Press + symbol and add a new row.
5. Press the ventilation mode icon on the left to select a desired ventilation mode. There is no need to include a STAND-
BY mode in the schedule for intervals when the unit will not operate. The unit will be stopped during any intervals for
which no ventilation mode is assigned.
6. Set the start and end time for a ventilation mode. If you need 24-hour ventilation, set the start time for 0:00 and the
end time for 24:00.
7. To add an additional row, press + under the last scheduled row (maximum 5 rows). If the last event ends at 24:00, you
will have to delete it to add a new row.
8. To add another sheet, press + at the bottom of the window (maximum 4 sheets).
Scheduling
CUSTOM
0 4 8 12 16 20 24
Mo
Tu
We
Th
Fr
Sa
Su
CUSTOM
Mo Tu We Th Fr
Sa Su
CUSTOM
Mo Tu We Th Fr
Sa Su
Weekdays
Tu
Th
Sa
Mo
We
Fr
Su
5 s
CUSTOM
Mo Tu We Th Fr
Sa Su
CUSTOM
Mo Tu We Th Fr
Sa Su
00:00
00:01
1
CUSTOM
Mo Tu We Th Fr
Sa Su
00:00
00:01
Operation mode
STANDBY
AWAY
NORMAL
INTESIVE
BOOST
CUSTOM
Mo Tu We Th Fr
Sa Su
00:00
00:01
Start
06:00
00:00
23:59
Содержание Domekt CF 200 V
Страница 1: ...DOMEKT User Manual EN ...