TP-6196 5/04
21
Section 4 Controller
Section 4 Controller
4.1 Introduction
This
section
covers
operation,
configuration,
adjustment, and replacement of the ADC 2100
controller.
See
Section
3
for
troubleshooting
procedures.
See Figure 4-1 for the locations of the controller and
related components.
Section 4.2 describes the
controller keypad and display.
Section 4.3 describes the sequence of operation, and
faults are described in Section 4.4.
Controller
configuration and adjustment are covered in Section
4.5.
A silicon controlled rectifier (SCR) module works with
the controller to regulate the output voltage.
See
Section 4.9.
A relay interface board (RIB) is used with the ADC
controller.
Section 4.8 describes the standard and
optional RIBs.
1
GM29253
1. Controller
2. SCR module
3. Ground stud
4. L0 stud
5. Relay interface board (RIB)
6. Line circuit breaker (load connection)
7. Engine harness-to-controller connection
8. Generator set master switch
3
7
1
5
6
6
8
1
4
2
Figure 4-1
Advanced Digital Control (ADC 2100)
Содержание 12RES
Страница 2: ......
Страница 24: ...TP 6196 5 04 14 Section 2 Scheduled Maintenance Notes ...
Страница 80: ...TP 6196 5 04 70 Section 6 Disassembly Reassembly Notes ...
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......