6.3 Feed systems 

When  storage  facilities  for  wood  are  required  the  wood 
should be kept at least 1.5m (5ft) from the heating appli-
ance. 
 
All  the  geared  motors  on  the  feed  systems  are  mainte-
nance-free. 
 

A change of lubricant and/or oil is recommended every 
20,000 operating hours or every three years. 

Re-lubricate  flange  bearings  and  other  lubricating 
points regularly with lithium soap grease. 

Check chain drives for wear and, if necessary, tighten 
them up and lubricate with chain oil. 

Check all the bolts to be sure they are snug. 

Once  a  year  check  the  extraction  components  in  the 
silo and/or bunker for damage and soiling. Remove any 
foreign matter there might be. 

Rotary sweep extraction system (AG) 

Check  and  lubricate  elbow  joints,  pivot  pins,  tension 
springs  and  tension  chains.    Readjust  elbow  joints  if 
necessary. 

Inclined extraction system (AP/APS) 

Lubricate the gasket between the extraction casing and 
the geared motor and universal joint for the auger.  

 
If  fuel  hopper  is  installed,  do  not  after  equipment  in  any 
way. 
 
May be connected to an existing boiler or solar system. 
 
 

IMPORTANT: Never use inflammable lubricants! 

7  Shutdown 

Heating boiler 

Pipe-type heat exchanger: 
When the PYROT is put out of operation for a long pe-
riod (such as for summer breaks), be sure to carefully 
clean the pipe-type heat exchanger with a steel brush 
required. 

 

Prevent high-temperature corrosion when chipboards 
are incinerated: 
If the heating room is moist or there is any other at-
mosphere that promotes corrosion (e.g. poor ventila-
tion, residual enamel near the heating room, etc.), after 
carrying out the cleaning, also spray the pipe-type heat 
exchanger with biodiesel. 

 

If there is a danger of frost, empty the heating system, 
following the heating installer's rules, or have anti-frost 
agent filled. 

 
 
 
 
 
 

 

Control system 

Even when the PYROT is put out of operation for long pe-
riods,  the  power  supply  to  the  control system should not 
be interrupted (do not turn off master switch).  

Why? 

The  "intermittent  control  system"  switches  the  con-
sumer pumps on for five seconds every 24 hours. This 
prevents  the  pumps  from  jamming  during  long  stand-
stills. This saves on expensive repairs. 

Prevent  the  formation  of  condensation  in  the  lambda 
sensor. 

Extend the service life of the buffer battery. 

 

8  Carrying out disposals 

Shutdown 

If  necessary,  first  switch  off  the  PYROT  using  the  F1 
or F2 key. When the burn-out has taken place, and the 
burner has cooled off, turn off the master switch. 

 

Disconnect  the  mains  connection  to  the  control  cabi-
net. 

 

CAUTION DANGEROUS VOLTAGE! 
Only  licensed  electrical  firms  are  allowed  to  disconnect 
and dismantle the connection to the electrical network. 

 

Close  the  forward  flow  and  return  flow  slide  valves. 
 

Open  the  drain  tap  on  the  bottom  of  the  boiler  of  the 
PYROT and drain water.  

 

Only  heating  system  installers  may  drain  the  boiler  and 
dismantle the connections to the heating system. 

 

Disconnect the forward flow pipe and return flow pipe 
from the PYROT. 

 

Instructions regarding transport to a different location 

The  personnel  who  carry  out  transports  to  different  loca-
tions have to know the dangers involved of accidents that 
might arise in doing so and use suitable measures to pre-
vent such from happening. 

Instructions regarding waste disposal 

Ashes should be stored in covered metal container on non-
combustible floors away from combustible material 

Comply  with  customary  laws  and  regulations  on  dis-
posing of waste. 

Contract  a  disposal  firm  to  dispose  of  and  recycle 
waste in an environmentally friendly fashion.  

 
 
 

Содержание PYROT KPT 1250

Страница 1: ...Open windows and doors Inform your heating contractor Installation and service must be performed by a installer or service agency If the information in this manual is not followed exactly a fire o r e...

Страница 2: ...nually before the heating season begins Contaminated air Air contaminated by chemicals can cause by products in the combustion process which are poisonous to inhabitants and destructive to Viessmann e...

Страница 3: ...ed skin Wash area of contact thoroughly with soap and water Using a skin cream or lotion after washing may be helpful Gastrointestinal irritation If gastrointestinal tract irritation develops move the...

Страница 4: ...nformation Warnings draw your attention to the presence of potential hazards or information Cautions draw your attention to the presence of potential hazards or important product information Helpful h...

Страница 5: ...4 Commissioning Operation ________________________________________________ 15 4 1 The initial start up _____________________________________________________________________ 15 4 2 Operation _________...

Страница 6: ..._________ 27 6 2 Installing the displacement rods into the heat exchanger __________________________________ 29 6 3 Feed systems________________________________________________________________________...

Страница 7: ......

Страница 8: ...nt Open windows and doors Inform your heating contractor Combustion air and ventilation air openings Ensure that combustion air openings and ventilation air openings in the mechanical room are open Te...

Страница 9: ...ldings that contain gas burning equipment Note Viessmann does not test any detectors and makes no representation regarding any brand or type of de tector For safe operation We recommend that you frequ...

Страница 10: ...aps and toilet tanks Open faucets where appropriate Or Have someone check the building frequently dur ing cold weather and call a qualified service agency if required Or Install a reliable remote temp...

Страница 11: ...in clothes dryers Product information High efficiency with reduced emissions Viessmann solid fuel boiler may only be set up and commissioned by specialists This will rule out any incorrect assembly o...

Страница 12: ...ulated in the regulations of the Assembly and Installation In structions by the limits of the technical specifications in Spec Sheet 1010 Minimum Requirements for Wood Fuels Instructions by the safety...

Страница 13: ...ated and maintained properly can even the best of products fulfil their functions well doing so for a long time and free of malfunctions Compliance with the Cleaning section is mandatory 2 2 Excess te...

Страница 14: ...operation If the articulated arms or spring mounted plates are still covered by fuel refilling can be carried out immedi ately If the articulated arms or spring mounted plates are no longer covered by...

Страница 15: ...stem 5 Moving grate 6 Drive for automatic de ashing system optional 7 Rotation fan Viessmann patented 8 Rotation combustion chamber Viessmann pat ented 9 Boiler heat exchanger 10 Boiler door 11 Heat e...

Страница 16: ...ignition then takes place The ignition process stops as soon as the fire is started 4 2 2 Operation The material is supplied depending on the light barriers in the metering container and in the combus...

Страница 17: ...OIL OPERATION on and off F3 PYROT Parameters Setting parameters set point values the date and time F4 PYROT Loader System Setting of cycle switchover switching advance flow and post flow times F5 Gro...

Страница 18: ...Minimum YES Service Menu 14 Load storage unit to STORAGE UNIT AT BOTTOM To which heat storage sensor should the storage unit be loaded with wood operation Indication only for storage unit option 15 L...

Страница 19: ...fore connecting Conveyor System 1 e g spring operated extraction system inclined extraction system etc 39 Extraction System 1 Impulse 5 s Impulse for the cycle switching for Extraction System 1 e g sp...

Страница 20: ...elects the day pressing the button again drops the day 04 Heating Period 1 Start 6 00 Time to switch from lowered temperature or off to nor mal temperature 05 Heating Period 1 End 22 00 Time to switch...

Страница 21: ...N T Point 2 always has to be set higher than Point 1 The two points marked indicate the factory setting Point 1 is set to 43 C and Point 2 to 64 C This is equivalent to a steepness of approx 1 5 Room...

Страница 22: ...up during the heating pe riod On The boiler is heated up when prompted for heat and when there is sufficient system temperature Manual Pump on the valve is not controlled emergency opera tion screen...

Страница 23: ...tered in the form of heating periods Each weekly programme consists of the heating day start and end A maximum of seven heating periods is available 03 Heating Period 1 Heating days MON to SUN Day or...

Страница 24: ...days with KEYS F1 for Mon day to F7 for Sunday Pressing the button once selects the day pressing the button again drops the day 04 Heating Period 1 Start 6 00 Time to switch from lowered temperature...

Страница 25: ...y Pressing the button once selects the day pressing the button again drops the day 37 Heating Period 1 Start 6 00 Start clearance utility water heating 38 Heating Period 1 End 22 00 End clearance util...

Страница 26: ...screen number parameter factory setting 01 Operating mode automatic Select operating mode 02 Delay before connecting 15 min Clearance is given when the time set is up 03 Connecting temperature system...

Страница 27: ...which is then in operation with the solar pump For optimised functioning the flow rate in the sec ondary circuit has to be adapted to the primary circuit e g with flow rate gauges in the primary and...

Страница 28: ...ing hours Remove ash from the ex haust gas collector After approx 1000 operating hours Unplug the plug from the exhaust gas fan unscrew butterfly nuts pull out motor with impeller and clean with broo...

Страница 29: ...s operation or be secured against continuous op eration e g timer for limiting running time Continuous operation of the compressor indicates leak age in the air system Check air supply line and valves...

Страница 30: ...ubes and then put back in Insert the displacement rods into the heat exchanger tube with the thick end first Push until they are flush with the bottom of the tube Tolerance 5 mm Remove the displacemen...

Страница 31: ...ere is a danger of frost empty the heating system following the heating installer s rules or have anti frost agent filled Control system Even when the PYROT is put out of operation for long pe riods t...

Страница 32: ...with pre dryer max 4 0 of the total mass consequence of substantial overstepping of limit Moving the exhaust air lines Special maintenance instructions for cleaning exhaust air line 3 Origin and trea...

Страница 33: ...al mass The maximum water content allowed in the fuel when entering the furnace should be taken from the spec sheets for the furnace series With a pre dryer installed between the furnace and the fuel...

Страница 34: ...nition device defective The combustion chamber filling time is too short Use suitable dry fuel Readjust lambda sensor Replace ignition device Readjust combustion chamber Acknowledge with OK 20 Water l...

Страница 35: ...red Maintenance cover limit switch One of the maintenance covers is open or not closed properly Check and close all the maintenance covers Acknowledge with OK 51 52 Extraction system F4 lights up red...

Страница 36: ...loo Ontario N2V 2G5 Canada Tel 519 885 6300 Fax 519 885 0887 www viessmann ca info viessmann ca Viessmann Manufacturing Company U S Inc 45 Access Road Warwick Rhode Island 02886 USA Tel 401 732 0667 F...

Отзывы: