background image

 

 

 

   

23

 

5.4.4 Annex buildings 

Function (ECO-N): 

The  pipeline  is  usually  supplied  with  a  lowered  tempera-
ture  required  by  the  weather-guided  heating  control  sys-
tem.  The  utility  water  heater  is  loaded  at  the  maximum 
flow  temperature  set.  To  do  so,  the  heating  water  is  re-
channelled by a valve to the utility water heater. The inte-
grated timer shifts this to non-productive times, where the 
room heating unit is quickly interrupted.  

Operating modes for the room heating unit 

Off: 

The room heating system is switched off. 
 

Day/Night: 

Heating operation according to clocked programme. 
Normal temperature during the day and reduced tem-
perature at night. 

 

Day/Off: 

Heating operation according to clocked programme. 
Normal temperature during the day and switched off at 
night. 
 

Day: 

Normal temperature continuously. 
 

Night: 

Reduced temperature continuously. 
 

Manual: 

Pump on; the valve is not controlled (emergency opera-
tion). 

 

(screen number) parameter (factory setting) 

(01) Operating mode (Day/Night) 

Select operating mode 
 

(02) Number of heating periods (1) 

The weekly programme has to be entered in the form of 
heating periods. Each weekly programme consists of the 
heating day, start and end. A maximum of seven heating 
periods is available. 
 

(03) Heating Period 1/Heating days (MON to SUN) 

Day or days on which the switching times apply. Select 
the heating days with KEYS F1 (for Mon-day) to F7 (for 
Sunday). Pressing the button once 

 selects the day, 

pressing the button again 

 drops the day. 

 
 

 
(04) Heating Period 1/Start (6:00) 

Time  to  switch  from  lowered  temperature  (or  off)  to  nor-
mal temperature. 
 

(05) Heating Period 1/End (22:00) 

Time  to  switch  from  normal  temperature  to  lowered  tem-
perature (or off). 
 

(06-23) Heating Periods 2-7 

These depend on the number of heating periods (see 
screen 2), consisting of heating days, start and end. 
 

(24) Temperature of flow/at +5°C (43°C) 

 

(25) Temperature of flow/at -15°C (64°C) 

 

(26) Temperature Room Day (20°C) 

Setting for temperature of room during daytime operation. 
 

(27) Temperature Room Night (15°C) 

Setting for temperature of room during nighttime opera-
tion. 
 

(28) Night-time lowering of flow temperature 
by (-6°C) 

This temperature set is subtracted from the flow tempera-
ture calculated for night-time lowering. 
 

(29) Flow temperature; maximum (70°C) 

The maximum limit for the flow temperature. 
 

(30) ECOcircuit (YES) 

The ECO automatic savings system makes the heating 
switch on and off as required.  
 

(31) Switch off below system temperature (NO) 

Should the room heating unit group be switched off when 
a minimum system temperature is fallen short of? 
 

(32) Frost protection function (YES) 

With the frost protection function switched on, the room 
heating unit is turned on when there is a danger of frost. 
 

(33) Carry off excess heat (NO) 

If the PYROT is at risk of overheating, there is the option 
of the excess heat being carried off. The room heating 
unit adjusts to "Flow temperature/Maximum". 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание PYROT KPT 1250

Страница 1: ...Open windows and doors Inform your heating contractor Installation and service must be performed by a installer or service agency If the information in this manual is not followed exactly a fire o r e...

Страница 2: ...nually before the heating season begins Contaminated air Air contaminated by chemicals can cause by products in the combustion process which are poisonous to inhabitants and destructive to Viessmann e...

Страница 3: ...ed skin Wash area of contact thoroughly with soap and water Using a skin cream or lotion after washing may be helpful Gastrointestinal irritation If gastrointestinal tract irritation develops move the...

Страница 4: ...nformation Warnings draw your attention to the presence of potential hazards or information Cautions draw your attention to the presence of potential hazards or important product information Helpful h...

Страница 5: ...4 Commissioning Operation ________________________________________________ 15 4 1 The initial start up _____________________________________________________________________ 15 4 2 Operation _________...

Страница 6: ..._________ 27 6 2 Installing the displacement rods into the heat exchanger __________________________________ 29 6 3 Feed systems________________________________________________________________________...

Страница 7: ......

Страница 8: ...nt Open windows and doors Inform your heating contractor Combustion air and ventilation air openings Ensure that combustion air openings and ventilation air openings in the mechanical room are open Te...

Страница 9: ...ldings that contain gas burning equipment Note Viessmann does not test any detectors and makes no representation regarding any brand or type of de tector For safe operation We recommend that you frequ...

Страница 10: ...aps and toilet tanks Open faucets where appropriate Or Have someone check the building frequently dur ing cold weather and call a qualified service agency if required Or Install a reliable remote temp...

Страница 11: ...in clothes dryers Product information High efficiency with reduced emissions Viessmann solid fuel boiler may only be set up and commissioned by specialists This will rule out any incorrect assembly o...

Страница 12: ...ulated in the regulations of the Assembly and Installation In structions by the limits of the technical specifications in Spec Sheet 1010 Minimum Requirements for Wood Fuels Instructions by the safety...

Страница 13: ...ated and maintained properly can even the best of products fulfil their functions well doing so for a long time and free of malfunctions Compliance with the Cleaning section is mandatory 2 2 Excess te...

Страница 14: ...operation If the articulated arms or spring mounted plates are still covered by fuel refilling can be carried out immedi ately If the articulated arms or spring mounted plates are no longer covered by...

Страница 15: ...stem 5 Moving grate 6 Drive for automatic de ashing system optional 7 Rotation fan Viessmann patented 8 Rotation combustion chamber Viessmann pat ented 9 Boiler heat exchanger 10 Boiler door 11 Heat e...

Страница 16: ...ignition then takes place The ignition process stops as soon as the fire is started 4 2 2 Operation The material is supplied depending on the light barriers in the metering container and in the combus...

Страница 17: ...OIL OPERATION on and off F3 PYROT Parameters Setting parameters set point values the date and time F4 PYROT Loader System Setting of cycle switchover switching advance flow and post flow times F5 Gro...

Страница 18: ...Minimum YES Service Menu 14 Load storage unit to STORAGE UNIT AT BOTTOM To which heat storage sensor should the storage unit be loaded with wood operation Indication only for storage unit option 15 L...

Страница 19: ...fore connecting Conveyor System 1 e g spring operated extraction system inclined extraction system etc 39 Extraction System 1 Impulse 5 s Impulse for the cycle switching for Extraction System 1 e g sp...

Страница 20: ...elects the day pressing the button again drops the day 04 Heating Period 1 Start 6 00 Time to switch from lowered temperature or off to nor mal temperature 05 Heating Period 1 End 22 00 Time to switch...

Страница 21: ...N T Point 2 always has to be set higher than Point 1 The two points marked indicate the factory setting Point 1 is set to 43 C and Point 2 to 64 C This is equivalent to a steepness of approx 1 5 Room...

Страница 22: ...up during the heating pe riod On The boiler is heated up when prompted for heat and when there is sufficient system temperature Manual Pump on the valve is not controlled emergency opera tion screen...

Страница 23: ...tered in the form of heating periods Each weekly programme consists of the heating day start and end A maximum of seven heating periods is available 03 Heating Period 1 Heating days MON to SUN Day or...

Страница 24: ...days with KEYS F1 for Mon day to F7 for Sunday Pressing the button once selects the day pressing the button again drops the day 04 Heating Period 1 Start 6 00 Time to switch from lowered temperature...

Страница 25: ...y Pressing the button once selects the day pressing the button again drops the day 37 Heating Period 1 Start 6 00 Start clearance utility water heating 38 Heating Period 1 End 22 00 End clearance util...

Страница 26: ...screen number parameter factory setting 01 Operating mode automatic Select operating mode 02 Delay before connecting 15 min Clearance is given when the time set is up 03 Connecting temperature system...

Страница 27: ...which is then in operation with the solar pump For optimised functioning the flow rate in the sec ondary circuit has to be adapted to the primary circuit e g with flow rate gauges in the primary and...

Страница 28: ...ing hours Remove ash from the ex haust gas collector After approx 1000 operating hours Unplug the plug from the exhaust gas fan unscrew butterfly nuts pull out motor with impeller and clean with broo...

Страница 29: ...s operation or be secured against continuous op eration e g timer for limiting running time Continuous operation of the compressor indicates leak age in the air system Check air supply line and valves...

Страница 30: ...ubes and then put back in Insert the displacement rods into the heat exchanger tube with the thick end first Push until they are flush with the bottom of the tube Tolerance 5 mm Remove the displacemen...

Страница 31: ...ere is a danger of frost empty the heating system following the heating installer s rules or have anti frost agent filled Control system Even when the PYROT is put out of operation for long pe riods t...

Страница 32: ...with pre dryer max 4 0 of the total mass consequence of substantial overstepping of limit Moving the exhaust air lines Special maintenance instructions for cleaning exhaust air line 3 Origin and trea...

Страница 33: ...al mass The maximum water content allowed in the fuel when entering the furnace should be taken from the spec sheets for the furnace series With a pre dryer installed between the furnace and the fuel...

Страница 34: ...nition device defective The combustion chamber filling time is too short Use suitable dry fuel Readjust lambda sensor Replace ignition device Readjust combustion chamber Acknowledge with OK 20 Water l...

Страница 35: ...red Maintenance cover limit switch One of the maintenance covers is open or not closed properly Check and close all the maintenance covers Acknowledge with OK 51 52 Extraction system F4 lights up red...

Страница 36: ...loo Ontario N2V 2G5 Canada Tel 519 885 6300 Fax 519 885 0887 www viessmann ca info viessmann ca Viessmann Manufacturing Company U S Inc 45 Access Road Warwick Rhode Island 02886 USA Tel 401 732 0667 F...

Отзывы: