![Klever ZTT-3,2 Strige Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/klever/ztt-3-2-strige/ztt-3-2-strige_operation-manual_1977615020.webp)
20
Table 4.1, continued
No.
Nameplate / application
Designation, meaning of the plate
10
ZTT-22.014
-
Application
11
ZTT-22.015 - Application
12
ZTT-22.017 - Application
13
RSM-10B.22.00.012
"Sign of Slinging"
14
ZTT-22.024
-
Application
15
ZTT-22.024-01
-
Application
Check the reliability of rotors
fastening
Before mower commissioning, make sure that
beveling knife is reliably secured to prevent their
unexpected tear off at operation. Check the cut
device parts fastening in every 4 hours of
operation!
IT IS FORBIDDEN
Provide maintenance and repair at
activated tractor power take-off!
Содержание ZTT-3,2 Strige
Страница 1: ...ROTARY MOWER ZTT 3 2 Strige Operation Manual Catalog of parts and assembly units ZTT 3 2 00 000 RE...
Страница 4: ...4 Operation Manual...
Страница 17: ...17 Figure 4 1 Location of nameplates...
Страница 39: ...39 CATALOGUE OF PARTS AND ASSEMBLY UNITS...
Страница 41: ...1 Illustrations and a list of assembly units and parts Figure 1 General aspect...
Страница 44: ...Figure 3 Fuse Installation...
Страница 46: ...Figure 4 Hanging and Lifting Mechanism...
Страница 48: ...Figure 5 Spring Blocks...
Страница 50: ...Figure 6 Installation of Small Beam...
Страница 52: ...Figure 7 Drive Installation...
Страница 54: ...Figure 8 Fencing and Frame...
Страница 57: ...57 Figure 10 Cut Device with Reducer...
Страница 59: ...59 Figure 11 Cut Unit with Reducer...