KIRLOSKAR 65-DSM 315M Скачать руководство пользователя страница 6

 - 5 -

 

4.4 Lubrication

 

  

4.4.1

 

Type of lubricant – The bearings are grease lubricated. 

 
4.4.2

 

Quantity of grease – Please refer to Technical Data chart. 

 

4.4.3

 

Refilling period – After 1000 hours of running. 

 

4.4.4

 

Bearing temperature – The permissible bearing temperature rise is 40°C 

above ambient temperature. 

 

4.4.5

 

Grades of recommended grease 

Following grades of grease of their equivalents available in the market are 
suitable for bearing lubrication. 

 

INDIAN OIL  - SERVOGEM - 3 
CALTEX   - STARFAK - 3 

HINDUSTAN PETROLEUM NATRA- 3 OR LITHON - 3 

 

4.5 Stuffing box

 

 

4.5.1

 

Stuffing box – The stuffing boxes are extra deep to reduce the leakage. 

 
4.5.2

 

Stuffing box sealing – Lantern ring provided for sealing purpose is used 

only in first stage stuffing box. Normally clear cold self liquid only is used 

for sealing. Grease Sealing/ External sealing can be provided against 
specific request. 

 

4.5.3

 

Stuffing box packing  

Champion Style–3316–Graphited Cotton Grease packing is used in the 

pump as a standard supply. However, stuffing box packing suitable for 
liquid handled is supplied against specific requirements. 

For DSM-3, 65 DSM-315 M, DSM 1E, DSM 2E, DSM 3ME, DSM-4RM, 
DSM-4RN, DSM-4RR pumps the stuffing box packing is sent duly packed 

in the pump. For other pumps the packing and lantern ring are sent 
separately alongwith the pump. 

 

4.5.4

 

Stuffing box packing size – Please refer Technical Data Chart. 

4.5.5

 

Flexible couplings – The pumps are supplied with LOVE-JOY type & pin 

bush type flexible couplings. Details (of rubber bushes) are given in 
Technical Data Chart. 

4.5.6

 

Packing between upper and lower half casing- 

Dalmia Duplex board packing paper to be used of following thickness. 

Pump Type 

Packing thickness 

in mm 

DSM-1 
DSM-1E 

DSM-2 
DSM-2E 

DSM-3 

DSM-3M 
DSM-3ME 

65 DSM-315M 
DSM-4RM, DSM-4RN, DSM-4RR 

DSM-5 

DSM-5B 
DSM6-15°, DSM6-30° 

DSM 150-45 

 
 

 
 

 

 

         0.8 mm 

 

 

Содержание 65-DSM 315M

Страница 1: ...INSTRUCTIONS ON INSTALLATION OPERATION AND MAINTENANCE FOR KIRLOSKAR PUMP TYPE DSM STANDARD KIRLOSKAR BROTHERS LIMITED UDYOG BHAVAN TILAK ROAD PUNE 411 002...

Страница 2: ...from the date of commissioning of the equipment or 18 months from the date of despatch from our factory whichever is earlier Our liability in respect of any complaint is limited to replacing part par...

Страница 3: ...PERATION 4 TECHNICAL DATA 5 MAINTENANCE 6 OVERHAULING 7 SPARE PARTS LIST AND CROSS SECTIONAL DRAWINGS PLEASE FURNISH COMPLETE NAMEPLATE DETAILS NAME OF THE PARTS PART NOS AND MATERIAL OF CONSTRUCTION...

Страница 4: ...ion Maintenance of Kirloskar Centrifugal Pumps which is also printed alongwith this booklet must be followed carefully 2 1 The sealing connection piping to the pump stuffing box must be made after ins...

Страница 5: ...defects are noticed Do not start the pump unless the defects are rectified Report immediately to the supplier if it is not possible to rectify the defects 3 4 During stopping the pump 3 4 1 Close the...

Страница 6: ...nal sealing can be provided against specific request 4 5 3 Stuffing box packing Champion Style 3316 Graphited Cotton Grease packing is used in the pump as a standard supply However stuffing box packin...

Страница 7: ...SM6 30 DSM150 45 50 X 65 65 X 80 65 X 80 80 X 100 100 X 125 100 X 125 100 X 125 125 X 150 150 X 200 150 X 175 6305 6306 6306 6307 6309 21309cc 6315 N310 6305 6306 6306 6307 3309 6413 2 x 7310 BG 100 1...

Страница 8: ...re All DSM pumps are similar in construction except some minor changes in the parts The important changes are 6 1 1 Shaft sleeves 310 311 are not provided in DSM 3 and DSM 1E 2E 3ME pumps 6 1 2 Stuffi...

Страница 9: ...it in clean dry place for further dismantling 6 2 6 Now start dismantling from driving end side Loosen the coupling nut 332 if provided 6 2 7 Take out flexible coupling pump half 390 with help of a pu...

Страница 10: ...320 in the keyways provided on the shaft Fix the impellers on the shaft with interstage ring 204 462 in between them First stage impeller should come towards non driving end 6 4 2 Put the shaft sleeve...

Страница 11: ...gently and neatly without disturbing the impellers or packing etc Insert the taper pins so that the two halves of the casings will take their proper seat 6 4 8 Now insert the bolts and nuts for upper...

Страница 12: ...ect drive Wear ring Interstage ring Cartridge for bearing DE Cartridge for bearing NDE Ball bearing DE Ball bearing NDE Bearing cover DE Bearing cover NDE Bearing COP Shaft sleeve DE Shaft sleeve non...

Страница 13: ...Taper pin with washes nuts for lower and upper half casing Pin for casing ring Pin for st box bush Pin for cartridge Pin for interstage diaphragm Drain plug for casing Plug for Suc Del Pressure gauge...

Страница 14: ...oupling pin Nut for coupling pin Washer for coupling pin Interstage diaphragm Gasket for shaft sleeve impeller Gasket for adaptor piece Pipe for sealing Pipe for priming only for DSM 6 DSM 150 45 Sock...

Страница 15: ...14 CROSS SECTION ASSEMBLY OF DSM 1E CCW CROSS SECTION ASSEMBLY OF DSM 2E CCW...

Страница 16: ...15 CROSS SECTION ASSEMBLY OF DSM 4 RM NOTE ALSO FOR DSM 4 RN DSM 4 RR CCW CROSS SECTION ASSEMBLY OF DSM 5 B CCW DSM 5 B F DSM 5 B MODIFIED...

Страница 17: ...16...

Страница 18: ...17 CROSS SECTIONAL ASSEMBLY OF DSM 3ME CCW NOTE ALSO FOR DSM 3 3 ME...

Страница 19: ...4 Ear defenders should be worn where the specified equipment noise level exceeds locally defined safe levels Safety glasses or goggles should be worn where working with pressurised systems and hazardo...

Страница 20: ...ETY INSTRUCTIONS WHILE COMMISSIONING OPERATION Do not touch any moving or rotating parts Guards are provided to prevent access to these parts where they have been removed for maintenance they must be...

Страница 21: ...fibrous material as these can be hazardous when the fibrous dust is inhaled Be cautious if other supplier s components have been substituted for genuine KBL parts these may then contain hazardous mat...

Страница 22: ...NCENTRIC TAPER PIECE INCORRECT LAYOUT OF SUCTION PIPE ECCENTRIC TAPER PIECE CORRECT LAYOUT OF SUCTION PIPE FOR RECOMMENDATIONS OF SUITABLE SUCTION AND DELIVERY PIPE SIZE PLEASE CONTACT OUR AUTHORISED...

Страница 23: ...n the factory alignment Re alignment is necessary after the complete unit has been levelled on the foundation and again after the grout has been set and foundation bolts have been tightened The alignm...

Страница 24: ...ight of the pipe lines does not fall on the pump The use of minimum number of the bends and other fittings will minimise the frictional losses SUCTION PIPE The suction pipe should be as short as possi...

Страница 25: ...ng on the kind of installation and service involved 1 Liquid level above pump level Pump is set below liquid level of source of supply so that liquid always flows to pump under positive head 2 Priming...

Страница 26: ...2 14 15 17 18 19 23 25 26 56 57 58 Pump delivers at reduced capacity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 56 57 58 Delivery performance deteriorates 1 3 7 9 10 11 12 13 14 19 20 21 22...

Страница 27: ...the sealing liquid inlet 26 Sealing liquid omitted 27 Packing incorrectly fitted 28 Gland tightened too much slanted 29 Packing not suitable for operating conditions 30 Shaft sleeve worn in the regio...

Страница 28: ...INSTRUCTION ON INSTALLATION OPERATION AND MAINTAINANCE FOR KIRLOSKAR SPLIT CASE PUMP DSM 100 36 DSM125 40 NON THRU BORE...

Страница 29: ...1...

Страница 30: ...2...

Страница 31: ...d stored in a dry place The coupling should be rotated at least once in a month to prevent pitting of bearing surfaces 2 INSTALLATIONS For location preparing foundation installation alignment piping g...

Страница 32: ...up its full speed 3 2 2 Open the valve on delivery side slowly 3 2 3 Open the cock for pressure gauge connection 3 3 During running the pump 3 3 1 The pump is running smoothly 3 3 2 The flow of sealin...

Страница 33: ...Please contact supplier if the pump is to be used for higher speeds 4 3 Bearings The shaft is supplied with below bearings 6 2 BEARING DETAILS BEARING No SKF OR EQUIVALENT Sr No PUMP TYPE DE NDE 01 02...

Страница 34: ...rease Sealing External sealing can be provided against specific request 4 5 3 Stuffing box packing for gland packed pumps Champion Style 3116 Non asbestos packing is used in the pump as a standard sup...

Страница 35: ...7 4 5 7 Technical data chart Position of lantern ring from Impeller side NDE side 2 L 3 for gland packing pumps...

Страница 36: ...rating spell the pump will be due for overhaul after about 5000 working hours This work should be done by skilled personnel 6 1 Dismantling Procedure for gland packed pumps 6 1 1 Drain the pump by ope...

Страница 37: ...Wipe over the shaft 180 with clean light oil 6 2 3 Place the impeller key 320 into the keyway and interstage ring 204 6 2 4 Check the 1st 2nd stage impeller for correct rotation and slide onto the sha...

Страница 38: ...casing 6 2 12 Place gland packing 430 lantern ring 227 in insert as per Cross sectional drawing 6 2 13 Fit the shoulder ring 199 onto shaft Ensure that no foreign particle should enter in bearing ass...

Страница 39: ...123 in such a way that impeller should not be damage 6 1 7 Remove all the screws of bearing cartridge 241 253 tightened with casing bearing cover 271 and dismantle the bearing cartridge 6 1 8 Remove t...

Страница 40: ...ight oil 6 4 3 Place the impeller key 320 into the keyway and interstage ring 204 6 4 4 Check the 1st 2nd stage impeller for correct rotation and slide onto the shaft from DE and NDE TABLE A STUFFING...

Страница 41: ...ighten up with the pump casing 6 4 11 Tighten the bearing cover 271 with bearing cartridge 6 4 12 Apply same procedure to the DE end side 6 4 13 Lift the rotating unit by means of crane Place it in lo...

Страница 42: ...20 Rotate the shaft by hand to assure smooth turning and that is free from rubbing or binding 7 CROSS SECTIONAL DRAWINGS 7 2 1 NON THRU BORE TYPE PUMP Gland packing type 7 2 2 THRU NON THRU BORE TYPE...

Страница 43: ...15 7 1 2 NON THRU BORE TYPE PUMP Mechanical seal type...

Страница 44: ...KEY FOR IMPELLER 1 321 KEY FOR COUPLING 1 323 KEY FOR SLEEVE 1 334 SHAFT SLEEVE NUT 4 336 ROUND LOCK NUT 2 415 LOCK WASHER FOR BEARING 2 441 GREASE NIPPLE FOR BEARING 2 450 VENT VALVE 2 519 GASKET FO...

Страница 45: ...1 3 2 Component for Gland packed pumps PART NO DESCRIPTION QTY 229 GLAND 2 224 CLAMPING PLATE FOR SPLIT GLAND 2 227 1 SPLIT LANTEN RING 1 228 STUFFING BOX BUSH 2 310 SHAFT SLEEVE 2 430 GLAND PACKING...

Страница 46: ...18...

Страница 47: ...19...

Страница 48: ...20...

Страница 49: ...21...

Страница 50: ...22...

Страница 51: ...23...

Страница 52: ...24...

Страница 53: ...25...

Страница 54: ...26...

Страница 55: ...S ON INSTALLATION OPERATION AND MAINTENANCE FOR KIRLOSKAR MULTISTAGE PUMP TYPE DSM THRU BORE DSM 50 20 DSM 65 20 DSM 50 28 DSM 65 32 A B DSM 80 36 KIRLOSKAR BROTHERS LIMITED UDYOG BHAVAN TILAK ROAD PU...

Страница 56: ...from the date of commissioning of the equipment or 18 months from the date of despatch from our factory whichever is earlier Our liability in respect of any complaint is limited to replacing part par...

Страница 57: ...ST AND CROSS SECTIONAL DRAWINGS Please furnish complete nameplate details name of the parts part nos And material of construction while ordering spare parts for the pumps CAUTION THIS INSTRUCTION MANU...

Страница 58: ...ance trouble shooting etc the instructions given in our publication GENERAL INSTRUCTIONS FOR INSTALLATION OPERATION AND MAINTENANCE OF KIRLOSKAR CENTRIFUGAL PUMPS which is also printed along with this...

Страница 59: ...rt the pump unless the defects are rectified Report immediately to the supplier if it is not possible to rectify the defects 3 4 During stopping the pump 3 4 1 Close the valve on delivery side 3 4 2 S...

Страница 60: ...reduce the leakage 4 5 2 Stuffing box sealing Lantern ring provided for sealing purpose is used only in first stage stuffing box Normally clear cold self liquid only is used for sealing Grease Sealin...

Страница 61: ...9 6306 6306 6307 NON DRIVING END 6307 6408 6306 6306 6307 QTY OF GREASE PER BRG Gms 100 100 100 100 100 ST BOX PACKING SIZE IN MM SIZE x LENGTH 10 SQ x 1660 10 SQ x 2010 10 SQ x 1560 10 SQ x 1560 10 S...

Страница 62: ...rocedure 6 1 1 Drain the pump by opening air vent valve 450 6 1 2 Remove all the nuts and bolts 572 581 and locating pin 611 of the upper and lower casing flange 6 1 3 Loosen all the insert joint nuts...

Страница 63: ...NDE 6 2 5 Place the distance sleeves 201 onto the shaft DE and NDE and using the impeller nut 300 and lock washer 410 tight against the impeller hub Slide the casing rings 199 onto the impellers 6 2 6...

Страница 64: ...2 18 Install casing gasket 519 with a light coat grease on both gasket surfaces Carefully align the inner edge of the gasket with the insert O rings 6 2 19 Lower the casing half upper 122 onto place a...

Страница 65: ...Plug for Suc Del Pressure gauge connections Plug for sealing Plug for st box leakage water Gland packing Paper packing between 122 123 O ring for shaft sleeve Grease nipple for lubrication Nylon tube...

Страница 66: ...IOM DSMT 0010 01 Issue Date 13 10 2000 Page Page 11 14 Last Revision Date CROSS SECTIONAL ASSEMBLY OF DSM 50 28 PUMP CW THRU BORE TYPE PUMP DSM 65 32A B DRG NO TC 172 90 003 0...

Страница 67: ...IOM DSMT 0010 01 Issue Date 13 10 2000 Page Page 12 14 Last Revision Date CROSS SECTIONAL ASSEMBLY OF DSM 80 36 PUMP CW THRU BORE TYPE PUMP DRG NO TC 172 90005 0...

Страница 68: ...IOM DSMT 0010 01 Issue Date 13 10 2000 Page Page 13 14 Last Revision Date CROSS SECTIONAL ASSEMBLY OF DSM 50 20 PUMP CW THRU BORE TYPE PUMP DRG NO TC 172 86 024 0...

Страница 69: ...IOM DSMT 0010 01 Issue Date 13 10 2000 Page Page 14 14 Last Revision Date CROSS SECTIONAL ASSEMBLY OF DSM 65 20 PUMP CW DRG NO TC 172 86 025 1...

Страница 70: ...4 Ear defenders should be worn where the specified equipment noise level exceeds locally defined safe levels Safety glasses or goggles should be worn where working with pressurised systems and hazardo...

Страница 71: ...ETY INSTRUCTIONS WHILE COMMISSIONING OPERATION Do not touch any moving or rotating parts Guards are provided to prevent access to these parts where they have been removed for maintenance they must be...

Страница 72: ...fibrous material as these can be hazardous when the fibrous dust is inhaled Be cautious if other supplier s components have been substituted for genuine KBL parts these may then contain hazardous mat...

Страница 73: ...NCENTRIC TAPER PIECE INCORRECT LAYOUT OF SUCTION PIPE ECCENTRIC TAPER PIECE CORRECT LAYOUT OF SUCTION PIPE FOR RECOMMENDATIONS OF SUITABLE SUCTION AND DELIVERY PIPE SIZE PLEASE CONTACT OUR AUTHORISED...

Страница 74: ...n the factory alignment Re alignment is necessary after the complete unit has been levelled on the foundation and again after the grout has been set and foundation bolts have been tightened The alignm...

Страница 75: ...ight of the pipe lines does not fall on the pump The use of minimum number of the bends and other fittings will minimise the frictional losses SUCTION PIPE The suction pipe should be as short as possi...

Страница 76: ...ng on the kind of installation and service involved 1 Liquid level above pump level Pump is set below liquid level of source of supply so that liquid always flows to pump under positive head 2 Priming...

Страница 77: ...2 14 15 17 18 19 23 25 26 56 57 58 Pump delivers at reduced capacity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 56 57 58 Delivery performance deteriorates 1 3 7 9 10 11 12 13 14 19 20 21 22...

Страница 78: ...the sealing liquid inlet 26 Sealing liquid omitted 27 Packing incorrectly fitted 28 Gland tightened too much slanted 29 Packing not suitable for operating conditions 30 Shaft sleeve worn in the regio...

Страница 79: ...INSTRUCTIONS ON INSTALLATION OPERATION AND MAINTENANCE FOR KIRLOSKAR PUMP TYPE DSM THRU BORE DSM 100 36 DSM 125 40 DSM 150 46 KIRLOSKAR BROTHERS LIMITED UDYOG BHAVAN TILAK ROAD PUNE 411 002...

Страница 80: ...from the date of commissioning of the equipment or 18 months from the date of despatch from our factory whichever is earlier Our liability in respect of any complaint is limited to replacing part par...

Страница 81: ...G 7 SPARE PARTS LIST AND CROSS SECTIONAL DRAWINGS Please furnish complete nameplate details name of the parts part nos And material of construction while ordering spare parts for the pumps CAUTION THI...

Страница 82: ...FOR INSTALLATION OPERATION AND MAINTENANCE OF KIRLOSKAR CENTRIFUGAL PUMPS which is also printed alongwith this booklet must be followed carefully 2 1 The sealing connection piping to the pump stuffing...

Страница 83: ...to be operated for a long time then drain the casing completely 4 TECHNICAL DATA 4 1 Direction of rotation The standard direction of rotation is clockwise when viewed from driving end The pump suitab...

Страница 84: ...elf liquid only is used for sealing Grease Sealing External sealing can be provided against specific request 4 5 3 Stuffing box packing Champion Style 3116 Graphited Cotton Grease packing is used in t...

Страница 85: ...UIV DRIVING END 6307 6309 N311 NON DRIVING END 3307 3309 2 x 7310 BG QTY OF GREASE PER BRG Cms 100 100 200 ST BOX PACKING SIZE IN MM SIZE x LENGTH 10 SQ x 2250 12 SQ x 2850 12 SQ x 3200 POSITION OF LA...

Страница 86: ...ions for leakage etc 6 OVERHAULING With normal daily operating spell the pump will be due for overhaul after about 5000 working hours This work should be done by skilled personnel 6 1 Dismantling and...

Страница 87: ...t gland 229 Remove the stuffing box packing 6 2 12 Remove the stuffing box bush 360 Also take out casing ring 190 6 2 13 Take out the shaft sleeve DE 310 Remove the O ring 522 6 3 Start dismantling fr...

Страница 88: ...the shaft This completes the assembly of rotating unit 6 4 4 Now lift the above rotating unit and fit it properly in the lower half casing so that pins 610 1 610 2 take their proper seating 6 4 5 Fit...

Страница 89: ...ompletes the re assembly While ordering spares specify nameplate details particularly machine numbers given in enclosed spare parts list Also specify quantity required 7 SPARE PART LIST PART NOS DESCR...

Страница 90: ...pin Drain plug for casing Plug for Suc Del Pressure gauge connections Plug for sealing Plug for st box leakage water St box packing Paper packing between 122 123 O ring for shaft sleeve Grease nipple...

Страница 91: ...IOM DSMT 001 01 Issue Date 13 10 2000 Page Page 12 12 Last Revision Date Drg No TC 172890060 CROSS SECTION ASSEMBLY OF NEW DSM CW NON THRU BORE PUMP DSM 100 36 DSM 125 40 DSM 150 46...

Страница 92: ...4 Ear defenders should be worn where the specified equipment noise level exceeds locally defined safe levels Safety glasses or goggles should be worn where working with pressurised systems and hazardo...

Страница 93: ...ETY INSTRUCTIONS WHILE COMMISSIONING OPERATION Do not touch any moving or rotating parts Guards are provided to prevent access to these parts where they have been removed for maintenance they must be...

Страница 94: ...fibrous material as these can be hazardous when the fibrous dust is inhaled Be cautious if other supplier s components have been substituted for genuine KBL parts these may then contain hazardous mat...

Страница 95: ...NCENTRIC TAPER PIECE INCORRECT LAYOUT OF SUCTION PIPE ECCENTRIC TAPER PIECE CORRECT LAYOUT OF SUCTION PIPE FOR RECOMMENDATIONS OF SUITABLE SUCTION AND DELIVERY PIPE SIZE PLEASE CONTACT OUR AUTHORISED...

Страница 96: ...n the factory alignment Re alignment is necessary after the complete unit has been levelled on the foundation and again after the grout has been set and foundation bolts have been tightened The alignm...

Страница 97: ...ight of the pipe lines does not fall on the pump The use of minimum number of the bends and other fittings will minimise the frictional losses SUCTION PIPE The suction pipe should be as short as possi...

Страница 98: ...ng on the kind of installation and service involved 1 Liquid level above pump level Pump is set below liquid level of source of supply so that liquid always flows to pump under positive head 2 Priming...

Страница 99: ...2 14 15 17 18 19 23 25 26 56 57 58 Pump delivers at reduced capacity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 56 57 58 Delivery performance deteriorates 1 3 7 9 10 11 12 13 14 19 20 21 22...

Страница 100: ...the sealing liquid inlet 26 Sealing liquid omitted 27 Packing incorrectly fitted 28 Gland tightened too much slanted 29 Packing not suitable for operating conditions 30 Shaft sleeve worn in the regio...

Страница 101: ...blin kbl co in REGISTERED OFFICE Udyog Bhavan Tilak Road Pune 411002 India Phone 91 20 24440156 Fax 91 24440156 GLOBAL PRESENCE Cambodia Egypt India Lao PDR Senegal South Africa Thailand The Netherlan...

Отзывы: