![KIRLOSKAR 65-DSM 315M Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/kirloskar/65-dsm-315m/65-dsm-315m_instruction-on-installation-operation-and-maintenance_1972124059.webp)
IOM/DSMT/0010/01 Issue Date: 13/10/2000
Page : Page 4/14 Last Revision Date:
3.2
Starting the pump
3.2.1 Start the pump. Let the prime mover pick up its full speed.
3.2.2
Open the valve on delivery side slowly.
3.2.3
Open the cock for pressure gauge connection.
3.3
During running the pump
3.3.1
The pump is running smoothly.
3.3.2
The flow of sealing water is uninterrupted.
3.3.3
Leakage through stuffing box is normal. This is required for cooling of Stuffing box/
Gland packing.
3.3.4
The bearings are not getting heated up excessively.
3.3.5
Head and capacity developed by the pump is as specified.
3.3.6
Power consumption is within limit.
3.3.7
Ensure that there is no mechanical friction in the pump.
3.3.8
Stop the pump immediately, if any defects are noticed. Do not start the pump
unless the defects are rectified. Report immediately to the supplier, if it is not
possible to rectify the defects.
3.4 During stopping the pump:
3.4.1
Close the valve on delivery side.
3.4.2
Stop the motor.
3.4.3
If the pump is not required to be operated for a long time, then drain the casing
completely.
4.
TECHNICAL DATA:
4.1
Direction of rotation
The standard direction of rotation is clockwise when viewed from driving end. The
pump suitable for anticlockwise rotation can also be supplied against specific
requirements.
4.2
Normally the pumps are supplied suitable for speed of 1450 rpm. Please contact
supplier if the pump is to be used for higher speeds.
4.3 Bearings
The shaft is supplied with antifriction bearings at driving end and non- driving end.
The details of the bearings are given in the technical data chart (4.5.7). The
designations of bearings are as per SKF catalogue. However, equivalent bearings in
type, capacity and dimensions are also used.
Содержание 65-DSM 315M
Страница 15: ...14 CROSS SECTION ASSEMBLY OF DSM 1E CCW CROSS SECTION ASSEMBLY OF DSM 2E CCW...
Страница 17: ...16...
Страница 18: ...17 CROSS SECTIONAL ASSEMBLY OF DSM 3ME CCW NOTE ALSO FOR DSM 3 3 ME...
Страница 29: ...1...
Страница 30: ...2...
Страница 35: ...7 4 5 7 Technical data chart Position of lantern ring from Impeller side NDE side 2 L 3 for gland packing pumps...
Страница 43: ...15 7 1 2 NON THRU BORE TYPE PUMP Mechanical seal type...
Страница 46: ...18...
Страница 47: ...19...
Страница 48: ...20...
Страница 49: ...21...
Страница 50: ...22...
Страница 51: ...23...
Страница 52: ...24...
Страница 53: ...25...
Страница 54: ...26...