![KIRLOSKAR 65-DSM 315M Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/kirloskar/65-dsm-315m/65-dsm-315m_instruction-on-installation-operation-and-maintenance_1972124004.webp)
- 3 -
1. GENERAL:
1.1
The booklet covers instructions for following models of DSM pumps.
Type of pump:
DSM-1E
DSM-2E
65-DSM, 315M
DSM-3
DSM-3ME
DSM-4RM, RSM-4RN, DSM-4RR
DSM-5B
DSM6-15°, DSM6-30°
DSM-150-45
1.2
These are Horizontal split Casing type, two stage pumps. This
construction enables to remove the rotating unit without disturbing pipe
connections and alignment.
1.3
Pumps when properly installed and given due attention in operation and
maintenance should operate satisfactorily for a long period.
1.4
When the pump is received, sometime before the actual use of pump, it
should be inspected and stored in dry place. The coupling should be
rotated once in a month to prevent pitting of bearing surfaces.
2
INSTALLATION :
For location, preparing foundation, installation, alignment, general maintenance,
trouble shooting etc., the instructions given in our publication
“General Instructions
for Installation, Operation & Maintenance of Kirloskar Centrifugal Pumps
.” which is
also printed alongwith this booklet must be followed carefully.
2.1
The sealing connection piping to the pump stuffing box must be made
after installing and before commissioning the pump. This piping is supplied
only for 65DSM 315M, DSM-4RM, DSM-4RN, DSM-4RR, DSM-5B, DSM-
6 and DSM 150-45 pumps. For other pumps, sealing connection is
integral.
2.2
Put gland packing and lantern ring, if it is sent separately along with the
pump. For DSM-3, 65 DSM 315M also DSM 1E, DSM 2E, DSM 3ME and
DSM-4RM, DSM-4RN, DSM-4RR pumps, stuffing boxes are packed with
packing before despatch. For balance pumps gland packings and lantern
rings are sent separately along with the pumps.
3. OPERATION:
3.1
Before starting the pump.
Check the following:
3.1.1.
The pump rotates freely by hand.
3.1.2.
Sealing connection provided is properly tightened and adjusted.
3.1.3.
Fill in the grease for bearings, if not done earlier.
3.1.4.
The direction of rotation of motor corresponds to the direction of rotation
of the pump.
3.1.5.
The pump and the suction pipe is fully primed with the liquid.
Содержание 65-DSM 315M
Страница 15: ...14 CROSS SECTION ASSEMBLY OF DSM 1E CCW CROSS SECTION ASSEMBLY OF DSM 2E CCW...
Страница 17: ...16...
Страница 18: ...17 CROSS SECTIONAL ASSEMBLY OF DSM 3ME CCW NOTE ALSO FOR DSM 3 3 ME...
Страница 29: ...1...
Страница 30: ...2...
Страница 35: ...7 4 5 7 Technical data chart Position of lantern ring from Impeller side NDE side 2 L 3 for gland packing pumps...
Страница 43: ...15 7 1 2 NON THRU BORE TYPE PUMP Mechanical seal type...
Страница 46: ...18...
Страница 47: ...19...
Страница 48: ...20...
Страница 49: ...21...
Страница 50: ...22...
Страница 51: ...23...
Страница 52: ...24...
Страница 53: ...25...
Страница 54: ...26...