-20-
-13-
Do not start 2 or more machines simultaneously. Start them one by one.
Do not use floodlight together with other machines.
CAUTION
8. Load
9. AC application
1) Be sure to run the generating set at rated speed, otherwise AVR (Automatic
Voltage Regulator) will produce the forced excitation. If the running is for a long
time under such condition, AVR will be burned out.
2) After switching on the air switch, observe the voltmeter on the panel of the
control cabinet, the voltmeter should point to 230V
5% (50Hz) for single-phase
generating set; 400V
5%(50Hz)for three-phase generating set, then the loading
can be carried out.
3) When the double voltage generating set changes over the voltage, the air
switch should be set at OFF position. Otherwise the generating set and electric
devices will be burned out and damaged.
4) Connect the equipment to the generating set in order. For the matter of the
motor load, firstly the heave-duty motor should be connected, and then the light-
duty motors. If the operation is false, the generating set will lag or stop suddenly. It
is necessary to unload the generating set immediately and turn off the main switch
and do checks.
: Consult with dealers.
: It is the time for the first check. From then on, check the items according to
the normal period.
The check time is different form its engine type. Please read the operation
manual carefully.
Check circuit terminal and connection
1000
Clean the inner of the fuel tank.
Check valve clearance.
Adjust fuel nozzle.
Check fuel injection time.
Check damper rubber.
Check if the relay can work
Measure insulated resistance
50
250
500
First
Check protection for electrical leakage
Check the nylon tube & rubber tube
Check & service item
Daily check
E
n
g
in
e
G
e
n
e
ra
to
r
Replace the air cleaner element