FP 25 E
Issue: 06/2011
46
4 .3
Spool Tower Operating Elements
1
2
3
4
5
6
Main switch
Fuse (6.3 A)
Toggle switch for spool size selection
Operating mode rotary switch
Press button: STOP
Speed rotary switch
4 .3 .1 Main Switch
Main switch in position I:
Spool tower is powered on. Switch lamp illuminates red.
Main switch in position 0:
Spool tower is off. Switch lamp is off.
4 .3 .2 Toggle Switch: Spool Size
Switch in position
=> up to 4000 m spool size is selected.
Switch in position
=> 4000 or 5000 m spool size.
Содержание FP 25 E PREMIERE
Страница 2: ......
Страница 22: ...FP 25 E Issue 06 2011 10 ...
Страница 25: ...FP 25 E Installation Mounting Issue 06 2011 13 2 3 2 Important Hints for Installation Projector Dimensions ...
Страница 56: ...FP 25 E Issue 06 2011 44 ...
Страница 64: ...FP 25 E Issue 06 2011 52 ...
Страница 104: ...FP 25 E Issue 06 2011 92 Figure 1 1A 1C 1B 1D Figure 2 2A Fig 2A Fig 2B Fig 2C 2D 2B ...
Страница 105: ...FP 25 E Issue 06 2011 93 Figure 3 3A Fig 3A Fig 3B Fig 3C Fig 3D Figure 5 3B 5A 5B Fig 4B Figure 4 4B Spare Parts ...
Страница 108: ...FP 25 E Issue 06 2011 96 Fig 6B Fig 6A 7B Figure 7 Fig 7a Fig 7B 7A 7B Figure 9 6A 6B 6B Figure 7 Figure 8 ...
Страница 110: ...FP 25 E Issue 06 2011 98 10A Figure 11 Figure 11 11A 11B 11C Fig 11A Fig 11C Fig 11B ...