8
FRAMING
Using 2x4s frame to local building codes.
DO NOT install against a Vapour Barrier or Exposed
Insulation.
Framing measurements have been adjusted to
accommodate a 1/2" thick finished wall. FIGURE 1
Combustible materials may be installed flush with top
and sides of fireplace.
It is not necessary to install a hearth with this
fireplace system. Objects placed in front of the fireplace
should be kept a minimum of 24" away from the front face.
Gas line installation should be performed only after
Fireplace installation. Fireplace bottom supplies you with
two 6"x8" rectangular holes. The use of these holes
depends on valve and Fireplace location on riser or upper
floor.
NOTE
Low profile enclosure 42.0" to 52.0"
must maintain a minimum clearance of
2" from top of 7.0" flex pipe and
insulation sleeve to bottom of combustible
enclosure top. Insulation sleeve
must be installed so that it covers 7.0"
flex pipe from fireplace up and to wall
sleeve.
Refer to Page #11 for any additional
information.
PENINSULA INSTALLATION INSTRUCTIONS
FRAMING DETAIL
HORIZONTAL RUN
WITH MIN. VERTICAL RUN
NOTE!
This UNIT is not
Load Bearing
MIN.
36.0"
FIGURE 1
THROUGH
Combustible
WALL
11.0"
11.0"
42.0" MIN.
For Combustible
Enclosure Top
INSULATION
SLEEVE
NAILING TABS
REAR STAND OFFS
COMPLETE WITH
NAILING TABS
2.5"
6.0"
11.062"
38.125"
37.0"
20.25"
GAS LINE
R/H UNIT
BOTTOM
ENTRY
2.0" X 3.0"
NOTCH FOR
END GAS
LINE ENTRY
GAS LINE
L/H UNIT
FIGURE 2
FIREPLACE ASSEMBLY
Rear standoffs are equipped with
nailing tabs. Level Fireplace nail or screw
into place.
NOTE!
For Log, Crushed Rock and Glowing Ember
installation refer to PAGE 16.
NOTE:
Clearance to back of unit and/or sides of unit
framed into walls require 6” minimum clearance to com-
bustibles. We recommend using two (2 x 4) studs placed
against the wall as per framing diagrams. See Page 3 -
Locating your Appliance, for additional information.