ZCV39 / ZCV42
Basic Finishing 5: Tile Border Behind S2PF Surround (3/4” Maximum Total Thickness)
Step One:
Frame Fireplace with nailing tabs oriented as
shown.
Step Two: Use Drywall to finish face of wall.
NOTE: Drywall will be flush with fireplace face.
Step 3: A tile, brick, or other non-combustible border
may be applied over fireplace face to conceal border.
IMPORTANT NOTE!:
If installing tile, brick, or other non-
combustible material around the perimeter of the surround:
you MUST Leave 1” of the face exposed around the fireplace
opening on the Bottom and Sides, and 1-3/16” exposed on the
top. This is to install and remove the surround. See drawings
below. A Tile Lip Kit (ZCV-TLK) is available.
Nailing Tab
1-3/16” MIN
Drywall
1
” M
IN
Fireplace Frame
Drywall
Tile
Tile
Tile
S2PF Surround
ZCV39
Fireplace
Opening
Required
Clearance
ZCV42
Fireplace
Opening
Required
Clearance
Bottom
of Unit
Bottom of Unit
27
Содержание marquis ZCV39LPE2
Страница 62: ...Gas Conversion for Modulator PART C 62...
Страница 67: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 67...
Страница 68: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 68...
Страница 75: ...Proflame 2 Remote Control 75...
Страница 77: ...77...