ZCV39 / ZCV42
Basic Finishing 4: Stone or Brick Around S2PF Surround
Step One:
Frame Fireplace with nailing tabs oriented as
shown.
Step Two: Use Drywall to finish face of wall.
NOTE: Drywall will be flush with fireplace face.
Step 3: A stone, brick, or other non-combustible border
may be applied over fireplace face to conceal border.
IMPORTANT NOTE!:
If installing stone, brick, or other non-
combustible material around the perimeter of the surround:
you MUST Leave 1-3/4” of the face exposed around the
fireplace opening on the Bottom and Sides, and 1-15/16”
exposed on the top. This is to install and remove the surround.
See drawings below. A Tile Lip Kit (ZCV-TLK) is available.
Nailing Tab
1-15/16” MIN
Drywall
1-3/4” MIN
Fireplace Frame
Stone, Brick, etc.
S2PF Surround
Stone, Brick, etc.
ZCV39
Fireplace
Opening
Required
Clearance
ZCV42
Fireplace
Opening
Required
Clearance
Bottom
of Unit
Bottom
of Unit
26
Содержание marquis ZCV39LPE2
Страница 62: ...Gas Conversion for Modulator PART C 62...
Страница 67: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 67...
Страница 68: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 68...
Страница 75: ...Proflame 2 Remote Control 75...
Страница 77: ...77...