24
TM
at a local recycling centre, indicating that said equipment
contains electric and electronic components (PUMP mod-
el). The correct collection and treatment of products, which
no longer are to be used, contributes to the preservation
of natural resources and avoids any potential public health
risks.
5. INSTALLATION
The installation of your osmosis equipment
should be carried out by a suitably qualified technician.
Please read carefully the user manual before use and con-
sult with your distributor in case of doubt.
Warning: Since the equipment to be installed will im-
prove the quality of your drinking water, all tools to be
used in the installation process should be clean, rust
and grease free. Only use tools, which are specifically de-
signed for membrane pipe cutting. Please keep tools clean
and disinfect them periodically.
Warning: The installation process should be carried
out under appropriate hygienic conditions, taking all
necessary precautions in relation to materials and
components that will come into contact with water to be
treated or consumed.
(For further information, please contact your distributor).
Warning: Avoid external contamination of the equip-
ment through improper handling, using gloves, sani-
tising gel and washing hands as often as is necessary
during the installation process, initial operation and equip-
ment maintenance.
The most common installation location tends to be under
the kitchen sink unit or in an annexed fitting.
Install the tap, the waste water clamp and entry inlet
adapter and connect the equipment’s respective connec-
tors (5, 6 and 7). Insert the filter cartridges into their respec-
tive heads after removing them from the packaging, should
they be supplied separately. Check the corresponding sec-
tion of the Technical Sheet.
Should the system comes with a separate tank, hydrauli-
cally connect it to the filtering equipment via the valve and
appropriate connectors.
Warning: Some of the installation accessories may
vary in function of the model and distribution region.
Use the appropriate tools and sealants to ensure that con-
nections do not leak.
Removal of safety plugs (4).
6. INITIAL OPERATION
6.1. MEMBRANE ASSEMBLY
This equipment includes a pre-installed encapsulated
membrane, thus it does not require any other additional
handling.
6.2. SANITIZE THE EQUIPMENT
Sanitize the equipment according to the model and proce-
dure indicated by
Sanitizing Procedure.
In the event of any queries please consult with your distrib-
utor.
6.3. TANK PRESSURE CHECK
With the water inlet stop cock closed and the tank empty;
check the tank pressure, which should be around 0.5 bar
(8).
6
40mm drain clamp.
5
7
Adapter and inlet valve for
3/8” connections.
4
8
Содержание ERGO RO BLUE
Страница 1: ...IU Instructions for use Reverse osmosis equipments...
Страница 2: ......
Страница 4: ......
Страница 5: ...User s Manual UM Reverse osmosis equipments...
Страница 9: ...9 UM 8 NOTES...
Страница 10: ......
Страница 11: ...Data Sheet Service Book DS Reverse osmosis equipments...
Страница 12: ...DS 12...
Страница 20: ......
Страница 21: ...Technical manual TM Reverse osmosis equipments...
Страница 27: ...27 TM 8 NOTES...
Страница 28: ......
Страница 29: ...Sanitising procedure SP Reverse osmosis equipments...
Страница 34: ...8 NOTES SP 34...
Страница 35: ...8 NOTES SP 35...
Страница 36: ...ERGOROBLUEIU2018 IU...