CENTAURI ENERGY SERVER
User Manual - Model 30-2017/12/18-VERSION 1.0
32
PV *# connection reversed
the MPPT*#
input line of the MPPT*# module
module is reversed.
MPPT fault
MPPT
Please ask the local authorized
system fault
technician for service.
MPPT
MPPT communication is
interrupted.
Confirm whether screws
of MPPT module are
loose.
Please ask the local
authorized technician for
service.
MPPT
The power of PV polar plate is
Judge whether the power of the
too high and there is instant
polar pole conforms to the
overcurrent protection
overcurrent.
system rated value.
Confirm whether the
The power of the polar plate is
power of the polar pole
too high or the local
and the environment
MPPT high-
environment temperature
temperature exceed the
temperature protection
rises too high or the high-
system requirements;
temperature of the module is
Please ask the local
caused by the fan fault.
authorized technician for
service.
The transient
The system automatic
BUS overvoltage
loading/unloading causes the
adjustment recovers one
fluctuation of busbar.
minute later;
If the overvoltage
The transient
phenomenon lasts for a
Overvoltage of PV capacitance
loading/unloading causes the
long time, please ask the
fluctuation of busbar.
local authorized
technician for service.
PV overvoltage
The set voltage of the polar
Reduce the Voc voltage of the
plate is too high.
polar plates in series.
Confirm the direction and the
PV under-voltage
Poor illumination
pavement gradient of the polar
plate.
MPPT is not detected.
MPPT shutdown of the
communication blackout.
MPPT system shuts down
and exits automatically at
night.
Turn on input switches of
PV1#- PV4#
;
The fixed screws of
MPPT module are loose,
please fasten them.
Service to be provided by
an authorized technician.
PV charging ON
Sufficient PV energy and the
system in normal operation.
Normal