When the maintenance work is complete, the state of no fault protection of AC power for 
the  load  is  switched  into  the  state  with  the  power  supply  protection  by  the  Server  by 
conducting the following steps. 

 

1.

 

Carefully confirm that there is nothing left in the cabinet of the Server and the internal 
connecting wires of the Server recover to the state before the maintenance. 

 

2.

 

Boot the system in the same way of “Booting Steps", at this moment, the  Server is in 
standby state and the "INV LED" LED flashes; 

 

3.

 

Turn off the maintenance bypass switch and then put on the dismantled buckle in place. 

 

4.

 

Click "

" button on the main interface→ "User Setup" button→ and input the 

 

password (the default password is “88888888”) and then click "

 " button, and then 

enter " INV " setup interface → " Manual Bypass" interface successively to select "OFF" 
option and  click "OK"  button.  At  this  point,  the  system exits  the maintenance  mode  to 
put an end to the maintenance work, and the load is powered up by the Server instead of 
the bypass system. 

 

3.5

 

System Setup

 

 

(Click “

” button to enter the system setup interface) 

 

3.5.1

 

Advanced Setup

 

 

(Click the "Advanced Setup" button and enter the advanced setup interface by entering the 
advanced password, which is only done by the authorized technical personnel). 

 

3.5.1.1

 

Setup of System Mode

 

 

Click  the  "System  Setup"  button  to  enter  the  "Working  Mode",  then  "Grid-connected/  off-
grid" mode or "off-grid" mode and the operation will be effective after confirmation. 

 

3.5.1.2

 

PV Auto Power-on Setting

 

 

PV automatic power-on: When the PV automatic power-on mode is set to the “ON” 
state  and  the  automatic  power-on  operation  can  be  done  in  the  following  two 
situations. 

 

1.

 

After  the  battery  low  voltage  protection  is  shut  down,  the  system  will  execute  the 
automatic power-on command when the MPPT is sufficient. 

 

2.

 

After the system sends the fault information and is shut down, the system 
automatically clears away the fault once when the PV is sufficient. 

 

Operation steps of PV automatic power-on: Click the “PV automatic Power-on" button 
to turn on or turn off this function. The system is in “ON” status by default. 

 
 
 
 
 
 
 
 
 
 
 
 

3.5.1.3

 

Power-On Setting 

 

Содержание 30-2012

Страница 1: ...CENTAURI ENERGY SERVER User Manual Model 30 2017 12 18 VERSION 1 0...

Страница 2: ...uttons 10 1 5 2 1 Description of Selection Button Functions 10 1 5 2 2 Description of Function Buttons 11 1 5 3 Introduction to Input Breaker 11 1 5 4 Introduction to Line Bank 12 1 5 5 Description of...

Страница 3: ...ng 24 3 5 1 3 Power On Setting 25 3 5 1 4 Other Settings 25 3 5 2 User Setup 25 3 5 2 1 MPPT Setup 25 3 5 2 2 INV Setup 25 3 5 2 3 Off Peak Setup 25 3 5 2 4 Protocol Setup 26 3 5 2 5 Language Selectio...

Страница 4: ...CENTAURI ENERGY SERVER User Manual Model 30 2017 12 18 VERSION 1 0 4 5 2 2 MPPT Warning Information 32 6 Attachment 33 6 1 Option 33 6 2 System Standard Accessories 33...

Страница 5: ...nance and repair of the Server which can be performed only by authorized technicians o This system is provided with multiple PV inputs therefore it should be connected with the independent loop withou...

Страница 6: ...cy even in the cases of a sudden change of AC input voltage and AC frequency over under voltage 1 2 Denomination GF 60K 360V 380V 3 3 Description of System Input output Three IN and Three OUT 380V vol...

Страница 7: ...real time alarm information with 10 000 history alarm records for user query to provide reliable basis for fault diagnosis o The user can perform various operating commands through the touch screen in...

Страница 8: ...nt power Parallel Active power KW Pout Active power machine Single machine When the Server is set as the single parameters system without parallel machine it only includes the load itself machine data...

Страница 9: ...meters Battery self check and Press this button to set battery test or terminate the test maintenance History button Press this button to view the history of the Server system Skip button Press this b...

Страница 10: ...le 3 System LED and Alarm 1 1 5 1 4 STATUS System Warning LED and Warning LED The red light is The green light is OFF Green light is normally on normally on normally on BYP bypass power Input voltage...

Страница 11: ...ystem alarm is activated by pressing this button again FAULT CLEAR Clear the system Press this button to clear executed abnormal protection fault command the system will restart and run EPO Emergency...

Страница 12: ...is BAT TEMP temperature Sensing used for the charge compensation BAT TEST Battery self Check The system performs the battery test The system boots in the standby mode by INV ON System ON pressing thi...

Страница 13: ...pack voltage 360Vdc The number of ESDs 12V 2V 30 180 Working mode The PV and AC are complementary to PV and AC Maximum voltage 0 V 750Vdc range Voc Best working voltage 450 550Vdc Vmp Maximum 98 conv...

Страница 14: ...es to bypass Automatically returns to Server when load is restored to normal 110 125 After10mins switches to bypass Automatically returns to Server when load is restored to normal Overload 125 150 Aft...

Страница 15: ...ncy stop Communication Computer RS232 RS485 and SNMP Option monitoring port interface Dry contact output Bypass input fault rectifier input fault system fault system 12Vdc 250Vac 1A alarm battery low...

Страница 16: ...oltage at the battery terminal will be more than 360 VDC which possesses the risk of fatal danger Please take off rings bracelets watches and other metal articles The tools with insulated handle s mus...

Страница 17: ...chematic Diagram of System Installation 1 The altitude is less than 1000 meters otherwise the derating of Server should be used 2 In the environment the bearing capacity should be greater than the equ...

Страница 18: ...ernal power supply should be more than 1 5 times of the equipment s rated power and the rated current of the power circuit breaker supply nearby the supply equipment should be more than 1 2 times not...

Страница 19: ...ables should be around 2 10 meters Longer cable lengths lead to low voltage and therefore cross section area of the corresponding cable should be increased Rated Standards 10 20 30 40 50 60 Capacity K...

Страница 20: ...he output and output poles of the corresponding PV combiner boxes of PV1 PV4 with the qualified connecting cables Besides the electrode and the grounding terminal cannot be shared among the different...

Страница 21: ...ion involved in the operation steps and LED display are shown in the Product Profile Note 2 Before conducting any operation step described in this chapter please carefully read the instructions to avo...

Страница 22: ...f the touch screen Touch operation Click the button OFF button and OK button in turn the system will switch off the machine 2 Turn off the output switch 3 Switch off the switches of PV 1 PV 4 in turn...

Страница 23: ...bypass power supply through the maintenance bypass switch by conducting the following steps 1 After the bypass parameters is detected and confirmed being normal please click button on the main interf...

Страница 24: ...tenance work and the load is powered up by the Server instead of the bypass system 3 5 System Setup Click button to enter the system setup interface 3 5 1 Advanced Setup Click the Advanced Setup butto...

Страница 25: ...etup Operation method Click the User Setup button and input the password to enter the corresponding setting interface The user setting operation can only be done by the user 3 5 2 1 MPPT Setup MPPT se...

Страница 26: ...e can be displayed in the following two formats 1 Year month day 2 month day year 3 5 2 8 User Password Control Password The system will provide the password protection to limit the operator for some...

Страница 27: ...eater than the load power and AC fails the PV power will support the load at first and the extra power will be used to charge the battery Fig 10 AC Abnormal Mode 1 2 When the PV power is less than the...

Страница 28: ...time the rectifier charge function will recover to charge the battery Fig 12 Mode 1 for Off peak Electricity Consumption 2 Off peak of electricity consumption After the off peak electricity consumptio...

Страница 29: ...f input output and the battery are connected firmly and whether the insulation layer of the cables is in good condition 5 Ensure that the product should not be affected with dampness 6 Start up operat...

Страница 30: ...down duo to too low voltage of busbar The voltage of battery discharge and busbar is lower than minimum set value The system won t automatically boot until the AC recovers or the PV is sufficient and...

Страница 31: ...d itself is in Output in short circuit more than 5 times of the rated normal state and then press FAULT value within 100ms namely CLEAR button for recovery short circuit protection Press the red butto...

Страница 32: ...rature of the module is Please ask the local caused by the fan fault authorized technician for service The transient The system automatic BUS overvoltage loading unloading causes the adjustment recove...

Страница 33: ...e and start the charging function Table 14 MPPT Warning Information 6 Attachment 6 1 Option Harmonic suppression filter SNMP card Can sense remote wireless communication Parallel accessories Parallel...

Страница 34: ...rmation The use of any such information will be entirely at the user s risk c can change the contents of the user manual without prior notice and at its sole discretion The information contained in th...

Отзывы: