background image

 

CENTAURI ENERGY SERVER 

 

 

User Manual - Model 30-2017/12/18-VERSION 1.0 

 

33                                                                       

 

PV charging OFF 

Insufficient PV energy or 
MPPT is shut down manually. 

Enter MPPTsetting interface and 
start the charging function. 

 

Table 14 MPPT Warning Information 

 

6.

 

Attachment

 

 

6.1

 

Option 

 

Harmonic suppression filter

 

SNMP card: Can sense remote wireless communication.

 

Parallel accessories: Parallel connecting wires

 

485 communication line

 

Battery temperature sensor

 

6.2

 

System Standard Accessories

 

 

Owner’s Manual 1 copy 
RS232 communication connecting wire 1 pieces 

 

 

Содержание 30-2012

Страница 1: ...CENTAURI ENERGY SERVER User Manual Model 30 2017 12 18 VERSION 1 0...

Страница 2: ...uttons 10 1 5 2 1 Description of Selection Button Functions 10 1 5 2 2 Description of Function Buttons 11 1 5 3 Introduction to Input Breaker 11 1 5 4 Introduction to Line Bank 12 1 5 5 Description of...

Страница 3: ...ng 24 3 5 1 3 Power On Setting 25 3 5 1 4 Other Settings 25 3 5 2 User Setup 25 3 5 2 1 MPPT Setup 25 3 5 2 2 INV Setup 25 3 5 2 3 Off Peak Setup 25 3 5 2 4 Protocol Setup 26 3 5 2 5 Language Selectio...

Страница 4: ...CENTAURI ENERGY SERVER User Manual Model 30 2017 12 18 VERSION 1 0 4 5 2 2 MPPT Warning Information 32 6 Attachment 33 6 1 Option 33 6 2 System Standard Accessories 33...

Страница 5: ...nance and repair of the Server which can be performed only by authorized technicians o This system is provided with multiple PV inputs therefore it should be connected with the independent loop withou...

Страница 6: ...cy even in the cases of a sudden change of AC input voltage and AC frequency over under voltage 1 2 Denomination GF 60K 360V 380V 3 3 Description of System Input output Three IN and Three OUT 380V vol...

Страница 7: ...real time alarm information with 10 000 history alarm records for user query to provide reliable basis for fault diagnosis o The user can perform various operating commands through the touch screen in...

Страница 8: ...nt power Parallel Active power KW Pout Active power machine Single machine When the Server is set as the single parameters system without parallel machine it only includes the load itself machine data...

Страница 9: ...meters Battery self check and Press this button to set battery test or terminate the test maintenance History button Press this button to view the history of the Server system Skip button Press this b...

Страница 10: ...le 3 System LED and Alarm 1 1 5 1 4 STATUS System Warning LED and Warning LED The red light is The green light is OFF Green light is normally on normally on normally on BYP bypass power Input voltage...

Страница 11: ...ystem alarm is activated by pressing this button again FAULT CLEAR Clear the system Press this button to clear executed abnormal protection fault command the system will restart and run EPO Emergency...

Страница 12: ...is BAT TEMP temperature Sensing used for the charge compensation BAT TEST Battery self Check The system performs the battery test The system boots in the standby mode by INV ON System ON pressing thi...

Страница 13: ...pack voltage 360Vdc The number of ESDs 12V 2V 30 180 Working mode The PV and AC are complementary to PV and AC Maximum voltage 0 V 750Vdc range Voc Best working voltage 450 550Vdc Vmp Maximum 98 conv...

Страница 14: ...es to bypass Automatically returns to Server when load is restored to normal 110 125 After10mins switches to bypass Automatically returns to Server when load is restored to normal Overload 125 150 Aft...

Страница 15: ...ncy stop Communication Computer RS232 RS485 and SNMP Option monitoring port interface Dry contact output Bypass input fault rectifier input fault system fault system 12Vdc 250Vac 1A alarm battery low...

Страница 16: ...oltage at the battery terminal will be more than 360 VDC which possesses the risk of fatal danger Please take off rings bracelets watches and other metal articles The tools with insulated handle s mus...

Страница 17: ...chematic Diagram of System Installation 1 The altitude is less than 1000 meters otherwise the derating of Server should be used 2 In the environment the bearing capacity should be greater than the equ...

Страница 18: ...ernal power supply should be more than 1 5 times of the equipment s rated power and the rated current of the power circuit breaker supply nearby the supply equipment should be more than 1 2 times not...

Страница 19: ...ables should be around 2 10 meters Longer cable lengths lead to low voltage and therefore cross section area of the corresponding cable should be increased Rated Standards 10 20 30 40 50 60 Capacity K...

Страница 20: ...he output and output poles of the corresponding PV combiner boxes of PV1 PV4 with the qualified connecting cables Besides the electrode and the grounding terminal cannot be shared among the different...

Страница 21: ...ion involved in the operation steps and LED display are shown in the Product Profile Note 2 Before conducting any operation step described in this chapter please carefully read the instructions to avo...

Страница 22: ...f the touch screen Touch operation Click the button OFF button and OK button in turn the system will switch off the machine 2 Turn off the output switch 3 Switch off the switches of PV 1 PV 4 in turn...

Страница 23: ...bypass power supply through the maintenance bypass switch by conducting the following steps 1 After the bypass parameters is detected and confirmed being normal please click button on the main interf...

Страница 24: ...tenance work and the load is powered up by the Server instead of the bypass system 3 5 System Setup Click button to enter the system setup interface 3 5 1 Advanced Setup Click the Advanced Setup butto...

Страница 25: ...etup Operation method Click the User Setup button and input the password to enter the corresponding setting interface The user setting operation can only be done by the user 3 5 2 1 MPPT Setup MPPT se...

Страница 26: ...e can be displayed in the following two formats 1 Year month day 2 month day year 3 5 2 8 User Password Control Password The system will provide the password protection to limit the operator for some...

Страница 27: ...eater than the load power and AC fails the PV power will support the load at first and the extra power will be used to charge the battery Fig 10 AC Abnormal Mode 1 2 When the PV power is less than the...

Страница 28: ...time the rectifier charge function will recover to charge the battery Fig 12 Mode 1 for Off peak Electricity Consumption 2 Off peak of electricity consumption After the off peak electricity consumptio...

Страница 29: ...f input output and the battery are connected firmly and whether the insulation layer of the cables is in good condition 5 Ensure that the product should not be affected with dampness 6 Start up operat...

Страница 30: ...down duo to too low voltage of busbar The voltage of battery discharge and busbar is lower than minimum set value The system won t automatically boot until the AC recovers or the PV is sufficient and...

Страница 31: ...d itself is in Output in short circuit more than 5 times of the rated normal state and then press FAULT value within 100ms namely CLEAR button for recovery short circuit protection Press the red butto...

Страница 32: ...rature of the module is Please ask the local caused by the fan fault authorized technician for service The transient The system automatic BUS overvoltage loading unloading causes the adjustment recove...

Страница 33: ...e and start the charging function Table 14 MPPT Warning Information 6 Attachment 6 1 Option Harmonic suppression filter SNMP card Can sense remote wireless communication Parallel accessories Parallel...

Страница 34: ...rmation The use of any such information will be entirely at the user s risk c can change the contents of the user manual without prior notice and at its sole discretion The information contained in th...

Отзывы: