background image

                                               

 

Product Installation Manual

 

10 

 

output  line  connected  to  the  customer  equipment  on  the  copper  bar  with 
M10 bolt and nut; 

9

、在护罩中间贴好对应的

+/-

标帖,再把护罩插入底座相应的凹槽中;

 

9

 

Stick the corres/-labels in the middle of the shield, and then insert 
the shield into the corresponding groove of the base; 

如图

2

所示

:

 

As shown in the figure 2

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 

3

:接线盒样式

3

安装说明

 

Appendix 3: Installation Instructions 

for Junction Box Style 3 

1

、采高压磁瓶,用

M10X20

六角螺栓将两个高压磁瓶固定在电池架档条

的安装孔里;

 

1.

 

Adopt high-voltage magnetic bottles, and fix the two high-voltage 
magnetic bottles in the mounting holes of the battery rack bar A with 

护罩

 

Shield 

M10X30 

接线铜排

 

Connection copper bar 

电池架档条

 

Battery rack-Bar 

安装底板

 

Mounting base plate 

M8 

M8X25 

Содержание KLV2V100024VRCK

Страница 1: ...Product Installation Manual...

Страница 2: ...on of battery racks and inventory of accessories documents such as packing list battery installation schematic diagram installation and operation instructions in the accessory box shall be properly co...

Страница 3: ...rst step M8X60 M8X40 Firstly the two sides of the battery rack are laid flat on the ground and take rail Both ends are fixed on the side frame with crosspiece bolts M8X60 or M8X40 do not tighten first...

Страница 4: ...not tighten them first The Third step B M8X16 B Take Bar B use M8X16 bolts to fix on the inside of the column of the side frame do not tighten it first First install all the rear Bars B and do not in...

Страница 5: ...The Sixth step After the battery rack is installed place it in the determined installation position and install the foundation bolts 1 Nut 2 Elastic cushion 3 Flat cushion 4 Expansion pipe 5 M8 M8 exp...

Страница 6: ...Product Installation Manual 5 The Seventh step Referring to the wiring diagram batteries are installed from the bottom layer up in sequence Battery Note Battery polarity cannot be reversed...

Страница 7: ...ccessories note that the connecting strip should be fastened to the battery terminal with a reference torque of 12 15n m B Bar B B Bar B Bolt M8X16 Battery Connector Battery terminal bolt Terminal bol...

Страница 8: ...dix on the side frame on the Bar A and the upright post The Eleventh step After all the connecting wires and accessories of the battery pack are installed use a multimeter to measure whether the batte...

Страница 9: ...for M8 bolt is above the copper bar and the hole for M12 bolt is below Install M8X25 and M12X35 hexagon bolts into the corresponding copper bar holes 3 M5X25 3 Place the two shield support plates per...

Страница 10: ...rack Bar A with 2 pcs M8X25 bolts M8 bolts face up 7 M8 M8 7 Unscrew the M8 nut fit the copper nose of the output wire from the battery end onto the M8 screw and then tighten the nut including elastic...

Страница 11: ...hen insert the shield into the corresponding groove of the base 2 As shown in the figure 2 3 3 Appendix 3 Installation Instructions for Junction Box Style 3 1 M10X20 A 1 Adopt high voltage magnetic bo...

Страница 12: ...the corresponding copper bar holes 3 A M5X15 3 Place the shield support plate vertically close to the battery rack bar A take the pendant and close to the shield support plate Note that its grooves fa...

Страница 13: ...Product Installation Manual 12 Lssue A 2 Date 2021 05...

Отзывы: