
88
Step 35: Attach TNR Brace Assembly
Hardware
1 x
Pan Bolt
1 - (FW1 flat washer, LN1 lock nut - previously removed)
2 x
Pan Screw
1 x
Wood Screw
2 x
Wood Screw
PB2
Other Parts
1 x TNR3 Post Mount
TNR3 Post
Mount
Remove PB1 (Pan Bolt)
first then install PB2
(Pan Bolt with previously
removed LN1 lock nut)
PB2
8965
8965
S6
TNR2 Slide
Clamp Ring
S4
8963
S11
S11
S4
S6
2770
2618
TNR Brace
Assembly
Fig. 35.1
Fig. 35.2
Fig. 35.3
A:
Use (8965) TNR Upright as a guide to judge the proper bolt location, remove the bottom pan bolt and nut.
The bolt will no longer be needed, but keep the lock nut.
(fig. 35.1 and 35.2)
B:
Attach the top of the TNR3 Post Mount to TNR2 Slide Clamp Ring using 1 (PB2) Pan Bolt (with the
previously removed TN1 lock nut and 1 FW1 flat washer). (fig. 35.2)
C:
Insert TNR3 Post Mount on (8965) TNR Upright, pre-drill with a 1/8” (3.2mm) drill bit then attach with 2 (S6)
Pan Screws
.
(fig. 35.2)
D:
Attach (8963) TNR Ground Brace flush to the bottom of (2770) End Panel Left with 2 (S11) Wood Screws
and 1 (S4) Wood Screw. (fig. 35.1 and 35.3)
Remove H9 (Hex Bolt)
first then install TNR
Brace Assemlby with
Wood Screws as noted in
Fig. 35.3
LN1
FW1
Содержание Cedar Summit F29380
Страница 15: ...15 9 mm mm Actual Size...
Страница 119: ...119 NOTES...