
45
Step 11: Swing Beam Assembly
Hardware
A:
Attach 6 Swing Hangers to the (2614) Engineered Beam using 2 (G7) Hex Bolts (with 2 FW2 flat washers
and 1 LN2 lock nut) per Swing Hanger as shown in fig. 11.1.
B:
Flush to the Fort End of (2614) Engineered Beam attach 2 L-Beam Brackets with 2 (G21) Hex Bolts (with 2
FW2 flat washers and 1 LN2 lock nut). (fig. 11.1 and 11.2)
C:
Install 1 (WB7) Wafer Bolt (with FW2 flat washer and TN2 T-nut) in the middle bolt hole in (2614)
Engineered Beam as shown in fig. 11.3.
IT IS IMPORTANT THAT THIS BOLT IS ATTACHED. IT WILL
MINIMIZE CHECKING OF WOOD.
D:
Attach KidKraft Plaque to centre of (2614) Engineered Beam (over top of t-nut) using 4 (S18) Wood Screws.
(fig. 11.4)
Other Parts
Wood Parts
1 x
Engineered Beam 4 x 6 x 88”
Swing End
Fort End
Fort End
WB7
Fig. 11.1
Fig. 11.3
Fig. 11.2
2614
2614
2614
FW2
12 x
Hex Bolt (FW2 flat washer x 2, LN2 lock nut)
2 x
Hex Bolt (FW2 flat washer x 2, LN2 lock nut)
1 x
Wafer Bolt (FW2 flat washer & TN2 T-nut)
4 x
Wood Screw
6 x Swing Hangers
2 x L-Beam Bracket
1 x KidKraft Plaque
G21
S18
G7
WB7
Swing Hanger x 6
L-Beam
Bracket
Flush
L-Beam
Bracket
TN2
G21
FW2
LN2
FW2
LN2
FW2
G7
Fig. 11.4
x 4
S18
KidKraft Plaque
2614
Содержание Cedar Summit F29380
Страница 15: ...15 9 mm mm Actual Size...
Страница 119: ...119 NOTES...