
42
Step 10: Attach Tunnel Assembly to Fort
Part 1
A:
From inside Unit A slide the Tunnel Assembly through the opening onto the Tunnel Floor Assembly so it
sits tight to the (9089) Upper Tunnel Insert on Unit B, both posts and both (2774) Uprights and the tunnel floor
boards. (fig. 10.1, 10.2 and 10.3)
Tunnel Floor
Assembly
Unit B
Unit A
Fig. 10.1
Unit A
Tunnel Floor
Assembly
Post
Post
2774
2774
9089
Fig. 10.2
Fig. 10.3
Tight
Tight
Tight
Содержание Cedar Summit F29380
Страница 15: ...15 9 mm mm Actual Size...
Страница 119: ...119 NOTES...