
31
Complete Step 5 for both Fort Assemblies.
A:
From inside of the assembly centre (2608) Floor Joist over the pilot holes in both (2768) Panel Floors in the
Swing and Front Walls, measure 5/8” (15.9mm) down from the top of boards then attach (2608) Floor Joist to
each board using the left and centre holes with 2 (S4) Wood Screws per board. (fig.5.1, 5.2, 5.3 and 5.4)
Step 5: Floor Assembly
Part 1
2 x
Floor Joist
2608
Fig. 5.2
Wood Parts
Fig. 5.1
2608
Fig. 5.3
Hardware
8 x
Wood Screw
S4
2768
5/8” (15.9mm)
2768
Swing Wall
Front Wall
2608
2768
Front Wall
Swing Wall
S4
S4
Fig. 5.4
Notice holes used
Содержание Cedar Summit F29380
Страница 15: ...15 9 mm mm Actual Size...
Страница 119: ...119 NOTES...