
39
A:
Place Tunnel Floor Assembly between Unit A and Unit B tight to each (9084) Lower Tunnel Insert then attach
with 4 (S4) Wood Screws from the inside and 4 (S0) Truss Screws from the outside per end. (fig. 8.1, 8.2 and
8.3)
B:
Pre-drill with a 3/16” (4.8mm) drill bit then attach each Swing Bracket to the fort with 1 (WL3) Wafer Lag (with
FW1 flat washer) per bracket. (fig. 8.2 and 8.4)
Step 8: Attach Tunnel Floor Assembly to Fort
Tight
4 x
Wafer Lag (FW1 flat washer)
8 x
Truss Screw
8 x
Wood Screw
WL3
Hardware
S0
FW1
Swing
Bracket
x 4
x 4
Tight
WL3
Unit B
Unit A
S0
Tunnel Floor
Assembly
Tunnel Floor
Assembly
S0
Unit B
Unit A
Fig. 8.4
Fig. 8.3
Fig. 8.1
Top View
Fig. 8.2
S4
S4
9084
Содержание Cedar Summit F29380
Страница 15: ...15 9 mm mm Actual Size...
Страница 119: ...119 NOTES...