![KidKraft Cedar Summit BEAR CAVE LODGE FSC Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916031.webp)
31
2 x
1/4 x 2-1/4” Hex Bolt (LW1, FW1, TN1)
2 x
1/4 x 3” Lag Screw (FW1)
2 x
#8 x 3” Wood Screw
4 x
#8 x 2” Wood Screw
Hardware
Wood Parts
2 x
SW Ground 5/4 x 4 x 14-1/4”
2 x
Diagonal 1-1/4 x 3 x 22”
A:
Loosely attach 1 (2606) SW Ground to each (2607) Diagonal with 1 (H10) 1/4 x 2-1/4” Hex Bolt (with lock
washer, flat washer and t-nut) per board then place each (2607) Diagonal tight and flush to the front of (2627) SW
Wall Panel. (2606) SW Grounds to be flush to the bottom of (2627) SW Wall Panel. (fig. 5.1 and 5.2)
B:
Pre-drill pilot hole with a 3/16” drill bit then attach each (2607) Diagonal to (2627) SW Wall Panel with 1 (LS3)
1/4 x 3” Lag Screw (with flat washer) per board, checking that they remain flush to outside edge. (fig. 5.1 and 5.2)
C:
Make sure bottom of each (2606) SW Ground is flush to bottom of (2627) SW Wall Panel then attach with 2
(S11) #8 x 2” Wood Screws and 1 (S4) #8 x 3” Wood Screw per board. Tighten all bolts. (fig. 5.1 and 5.2)
LS3
S11
S4
S4
Flush
Flush
Step 5: Attach SW Ground and Diagonal
LS3
2606
2607
S11
Fig. 5.1
2627
Fig. 5.2
2606
2607
2627
H10
H10
TN1
FW1
FW1
LW1