![KidKraft Cedar Summit BEAR CAVE LODGE FSC Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916025.webp)
25
Step 3: Join Frame Assemblies
Part 3
C:
With at least two helpers lift the two wall assemblies so the (2792) Ground Braces meet the (2608) Floor Joist
as shown in fig. 3.5.
D:
Place 1 (2618) Front Back Panel between the 2 (2677) Narrow Panels on the outside of the (2792) Ground
Braces and (2608) Floor Joists on the front and back walls then from the inside of the assembly attach (2792)
Ground Braces and (2608) Floor Joists to each (2618) Front Back Panel with 4 (S11) #8 x 2” Wood Screws per
panel. (fig. 3.5)
2 x
Front Back Panel 1-1/4 x 42 x 87”
Wood Parts
Hardware
2618
8 x
#8 x2” Wood Screw
Tight
Front
Back
Fig. 3.5
S11
2618
2677
2677
2608
2792
x 4 per side
S11
Tight