![KidKraft Cedar Summit BEAR CAVE LODGE FSC Скачать руководство пользователя страница 102](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916102.webp)
102
2 x
Tunnel Side Joist 1-1/4 x 3-1/4 x 69-11/16”
6035
Step 57: Tunnel Frame Assembly
Part 1
Wood Parts
Hardware
4 x 5/16” TN2
Fig. 57.2
A:
Place 2 (6035) Tunnel Side Joists side by side making sure that the pre-drilled holes for the t-nuts are at the
top. Install 1 5/16” T-Nut on the inside of all 4 ends. (fig. 57.1 and 57.2)
Notice hole orientations
Fig. 57.1
TN2