112
Hardware
Fig. 63.6
Step 63: Build Tunnel Assembly
Part 3
F:
Join the 2 Tunnel Sides together so the tops are tight together and attach with 12 (MB1) #12 x ½” Pan Bolts
(with #12 Lock Nut). (fig. 63.6 and 63.7)
Fig. 63.7
x 12
x 12
MB1
12 x
#12 x 1/2” Pan Bolt (LN4)
MB1
LN4