![KidKraft Cedar Summit BEAR CAVE LODGE FSC Скачать руководство пользователя страница 134](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916134.webp)
134
Step 76: Attach Elbow Assembly to Elbow Assembly
Part 2
Hardware
5 x
1/4 x 3/4” Pan Bolt
(LN1 lock nut)
PB1
Other Parts
1 x TNR2 Slide Clamp Ring
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the
round recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose
until further step.
C:
Attach 1 TNR2 Slide Clamp Ring to the bottom of the joined Assemblies using 3 (PB1) 1/4 x 3/4” Pan Bolts
(with LN1 lock nut), making sure to match the arrows up with the end of the clamp ring (where a seam will be)
as shown in fig. 76.3 and 76.4.
D:
Connect the 2 TNR2 Slide Clamp Rings together in 2 spots using 1 (PB1) 1/4 x 3/4” Pan Bolt (with LN1
lock nut) per hole. Make sure seams and arrows line up and then tighten all bolts. (fig. 76.3 and 76.5).
DO NOT USE
USE IMAGE
DO NOT USE
USE IMAGE
Elbow
Assembly
Bottom Slide Bolt Holes
After the clamp rings
are attached to the
elbows, fasten them
end to end with two
pan bolts and lock nuts
PB1
PB1
DO NOT USE
USE IMAGE
Make sure arrows
are aligned
Elbow
Assembly
Fig. 76.3
Fig. 76.4
Fig. 76.5
LN1
LN1