87
Step 36: Attach Flange Assembly to Fort
A:
With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 36.1, then
pre-drill 1/8” pilot holes in the bottom 4 mounting locations on (2197) Floor Board (approximate spots where
circles are on figure), making sure the pre-drilled holes are a minimum of 1” deep.
B:
Attach Flange Assembly to the Crowsnest through (2197) Floor Board and into (2345) Porch Floor End
using 4 (S7) #12 x 2” Pan Screws (with #12 Screw Bezel) in the pre-drilled holes. (fig. 36.1 and 36.2) Make
sure the flat surfaces of the Flange Assembly are flush to the Crowsnest as shown in fig. 36.5.
C:
Attach the Flange Assembly flush to (2346) Porch Top End using 4 (S6) #12 x 1” Pan Screws (with #12
Screw Bezel) as shown in fig. 36.1 and 36.3 and to both (2338) Crowsnest Faces using 5 (S6) #12 x 1” Pan
Screws per board. (fig. 36.1, 36.4 and 36.6)
Hardware
14 x
#12 x 1” Pan Screw
4 x
#12 x 2” Pan Screw
8 x
#12 Screw Bezel
S7
Flange
Assembly
S7
#12 Screw
Bezel
#12 Screw
Bezel
Bottom
Sides
Top
2346
2338
2338
2345
2197
2346
Bottom of
slide flush
with deck
Top of slide
flush to (2346)
Porch Top End
Fig.36.1
Fig. 36.6
Fig. 36.4
Fig. 36.3
Fig. 36.2
Fig. 36.5
(hidden)
Outside View
Inside View
S6
S6
S6
(hidden)
(hidden)
2338
2338
Содержание BOULDER STATION
Страница 98: ...98 NOTES...
Страница 99: ...99 NOTES...