
62
D:
From inside the assembly place 2
(2195) Siding Uprights over the pilot holes
of the (2193) Siding and flush to the top of
(2190) Wall Board. Attach to (2190) Wall
Board and (2184) SW Ground with 2 (S2)
#8 x 1-1/2” Wood Screws per board. (fig.
22.4)
E:
From outside of the assembly attach
(2193) Siding to (2195) Siding Uprights
with 2 (S0) #8 x 7/8” Truss Screws per
siding. (fig. 22.4 and 22.5)
Hardware
Wood Parts
4 x
#8 x 1-1/2” Wood Screw
12 x
#8 x 7/8” Truss Screw
S2
2 x
Siding Upright 5/4 x 2 x 25-1/4”
2195
Step 22: Lower Swing Wall Assembly
Part 2
2184
S0
2195
S0
x 2 per
board
2195
2190
2193
Fig. 22.4
Fig. 22.5
pilot
holes
Flush
2193
Inside View
Outside View
Flush
S2
S2
(in behind
boards)
Содержание BOULDER STATION
Страница 98: ...98 NOTES...
Страница 99: ...99 NOTES...