144
REV.
A
DWG. NO.
SIZE
SCALE:1:50
•See details
WEIGHT:
SHEET 3 OF 3
RE-Bar Stake ISO
1 x Rebar Ground Stakes
Step 82: Attach Ground Stake to TNR Upright
Hardware
1 x
#12 x 2” Pan Screw
S7
Other Parts
S7
Rebar
Ground
Stake
8965
13” In Ground
(330mm)
Warning! To prevent tipping and avoid potential
injury, stakes must be driven 13” (330mm)
into ground. Digging or driving stakes can be
dangerous if you do not check first for under-
ground wiring, cables or gas lines.
A:
In the spot shown in (Fig. 82.1) drive 1 Rebar Ground Stake 13” (330mm) into the ground against the
(8965) TNR Upright. Be careful not to hit the washer while hammering stake into the ground as this could
cause the washer to break off.
B:
Attach the ground stake to (8965) TNR Upright just below the t-nut using 1 (S7) #12 x 2” Pan Screw as
shown in (Fig. 82.2).
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth
any sharp edges from impact area and touch up with outdoor paint.
T-Nut
Fig. 82.1
Fig. 82.2
SEE FRONT COVER FOR
SAFETY CLEARANCE
Содержание BEAR CAVE LODGE
Страница 149: ...149 NOTES...
Страница 150: ...150 NOTES...
Страница 151: ...151 NOTES...
Страница 152: ...152 NOTES...