87
2 angles shown, pick the best one
square each sub assembly
D
add 1/4" T-Nut to inside
of Long Post
Step 40: Lower Frame Assembly
Part 1
Fig. 40.1
Fig. 40.2
A:
Place 1 (6002) Long Post and 1 (6026) Rock Rail side by side with the (6002) Long Post on the left side
making sure that the notched out end is at the top and on the inside. It is important to ensure that the angled cut
on the (6026) Rock Rail is at the top, facing inwards towards the (6002) Long Post. Place 1 (6020) Short Ground
across the bottom of both pieces so that it’s flush with the ends of the (6002) Long Post and the (6026) Rock
Rail. Attach using 2 (H2) ¼ x 2” Hex Bolts (with lock washer, flat washer and t-nuts). (Fig. 40.2)
B:
From the underside of the assembly place 1 (6017) Floor Support making sure the pre-drilled holes match
what is shown on fig.(Fig. 40.2). Attach using 2 (H3) ¼ x 2-1/2” Hex Bolts (with lock washer, flat washer and
t-nuts). (Fig. 40.1 & Fig. 40.2)
1 x Long Post 31.8 x 82.6 x 1968.5mm
1 x Floor Support 31.8 x 82.6 x 875.3mm
1 x Short Ground 15.9 x 114.3 x 1122mm
1 x Rock Rail 31.8 x 69.9 x 1827mm
6020
6026
6017
6002
Wood Parts
Hardware
H2
H3
2 x
1/4 x 2” Hex Bolt (with 1/4” lock washer, 1/4” flat washer and 1/4” t-nut)
2 x ¼ x 2-1/2” Hex Bolts (with lock washer, flat washer and t-nuts).
1/4” t-nut
1/4” t-nut
2 angles shown, pick the best one
square each sub assembly
D
add 1/4" T-Nut to inside
of Long Post
6002
6020
6026
6017
Flush
Flush
1/4” lock
washer
1/4” lock
washer
1/4” lock
washer
1/4” lock
washer
1/4” lock
washer
1/4” flat
washer
1/4” flat
washer
1/4” flat
washer
1/4” flat
washer
1/4” flat
washer
H2
H2
H3
H1
H3
1/4” t-nut
1/4” t-nut
1/4” t-nut
Содержание BEAR CAVE LODGE
Страница 149: ...149 NOTES...
Страница 150: ...150 NOTES...
Страница 151: ...151 NOTES...
Страница 152: ...152 NOTES...