113
#8 x 3" WS x8
A
B
1/4 x 1-3/8" Wafer Lag x4
#8 x 3" WS x8
A
B
1/4 x 1-3/8" Wafer Lag x4
#8 x 3" WS x8
A
B
1/4 x 1-3/8" Wafer Lag x4
Hardware
Step 61: Attach Tunnel Assembly Frame to Fort
Part 1
Note: Move Adventure Tower to final location
A:
With a helper, lift the tunnel assembly frame so that it fits between the Adventure Tower and the Fort as shown
in fig. 61.1.
B:
From inside the Adventure Tower attach the (6035) Tunnel Side Joists to the Wall Supports using 4 (S4) #8 x 3”
Wood Screws. (fig. 61.1 and 61.2)
C:
Repeat Step B for the fort side.
D:
From outside the assembly pre drill 1/8” holes and attach the Swing Brackets to the Tower and Fort frames
using 1 (WL3) ¼ x 1-3/8” Wafer Lag (with flat washer) per bracket. (fig. 61.1 and 61.3)
Fig. 61.1
Fig. 61.2
Fig. 61.3
8 x
8 x 3” Wood Screw
4 x
1/4 x 1-3/8” Wafer Lag (1/4” flat washer)
WL3
S4
S4
1/4” Flat
Washer
WL3
Содержание BEAR CAVE LODGE
Страница 149: ...149 NOTES...
Страница 150: ...150 NOTES...
Страница 151: ...151 NOTES...
Страница 152: ...152 NOTES...