
42
Warning!
To prevent tipping and avoid potential injury, stakes must
be driven 13” into ground. Digging or driving stakes can be dangerous if you
do not check first for under-ground wiring, cables or gas lines.
A:
In the 5 places shown in fig. 10.1 drive the Rebar Ground Stakes 13” into the ground against outside front
corner of (2622) End Panel Assembly, on both (2607) Diagonals and both (2613) Heavy SW Posts. Be careful not
to hit the washer while hammering stakes into the ground as this could cause the washer to break off.
B:
Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake (fig. 10.2 and 10.3).
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 10: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
5 x
#12 x 2” Pan Screw
5 x Rebar Ground Stake
Other Parts
Rebar
Ground
Stake
13”
In Ground
S7
Fig. 10.1
Fig. 10.2
Fig. 10.3
2622
2607
S7
2613
2607
S7
13”
In Ground
Rebar
Ground
Stake
2622
Front
Содержание BEAR CAVE LODGE
Страница 149: ...149 NOTES...
Страница 150: ...150 NOTES...
Страница 151: ...151 NOTES...
Страница 152: ...152 NOTES...