104
A:
On the left side of the tunnel wall place 1 (6007) Wall Support beside the (6000) Upper Post. The top of the
(6007) Wall Support should be behind the (6030) Tunnel Side Top and the bottom end should be on the outside of
the (6017) Floor Support. Attach using 1 (H2) ¼ x 2” Hex Bolts (with flat washer, lock washer and t-nut) in tunnel
side and 1 (H3) ¼ x 2-1/2” Hex Bolt in Floor Support. (Fig. 53.1 & 53.2)
B:
Repeat step A to install a second (6007) Wall Support on the right side of the tunnel wall. (Fig. 53.1 & 53.2)
C:
Measure to ensure that there is a 17” (432mm) space between the 2 (6007) Wall Supports and attach 1 (6014)
Tunnel Spacer flush to the top of the floor boards with 5 (S11) #8 x 2” Wood Screws.(Fig. 53.1 & 53.2)
Step 53: Attach Tunnel Wall Assembly
flush to
floor boards
6007
6000
6012
6030
6002
6014
H2
H2
H3
H3
lock
washer
lock
washer
lock
washer
x 5
1/4”
t-nut
1/4”
t-nut
17” (432mm)
1/4”
t-nut
flat
washer
flat
washer
flat
washer
S11
Hardware
5 x
#8 x 2” Wood Screws
S11
Wood Parts
2 x
Wall Support 31.8 x 76.2 x 1095.4mm
1 x
Tunnel Spacer 31.8 x 76.2 x 430.2mm
2 x
¼ x 2-1/2” Hex Bolt (with flat washer, lock washer and t-nut)
2 x
¼ x 2” Hex Bolts Hex Bolt (with flat washer, lock washer and t-nut)
H3
H2
6007
6014
Fig. 53.2
Fig. 53.1
Содержание BEAR CAVE LODGE
Страница 149: ...149 NOTES...
Страница 150: ...150 NOTES...
Страница 151: ...151 NOTES...
Страница 152: ...152 NOTES...