manualshive.com logo in svg
background image

Содержание IGLOO NET GS-W803

Страница 1: ......

Страница 2: ...ondition of rope Checking of all rope surface Strengthned of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing condition of the steel component Protection of steel component from corrosion Measure In case of the appearance the defect detail is repaired usually within 3 days after checking GSWeb Playground Equipment...

Страница 3: ...imbing structure made of steel loaded Nylon cables and comes protected against UV The GS W802 features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensure long life of the games and maximum safety for the children...

Страница 4: ...tationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height a 5 7 1750mm from surface The Fall height on the external surface of a pyramid shaped space net is the hightest point attainable within a horizontal distance of b 44 1100mm from the edge of the structure where a free fall to the protective surface is possible This distance in based on t...

Страница 5: ...e 12 300 mm P2 Depth of concrete footing 19 600 mm Figure 3 Foundation section view Foundation Please refer to GS W803 drawing for exact installation dimensions Figure 4 Excavate enough materials to allow for proper depth of concrete footings Also ensure that there is enough space to allow the frame to be positioned properly Anchor wood support frame to ground with pickets to prevent the frame fro...

Страница 6: ...50 125 30 125 30 125 190 250 Positioning Post plate on footing CF L anchor hole Front edge of anchor plate must be installed 125mm from edge of concrete footing Figure 5 Concrete footing and Anchor plate layout Post Plate position Note Total distance from front of block to front of block is 2270mm ...

Страница 7: ...e Foundation 250 30 250 190 30 190 30 30 Figure 6 Wood support frame Assemble wooden support frames 4 frames Use min plywood not included in package a b b wood support frame for concrete NOTE Use post plate as guide for exact measurements a wood jig for Post plate ...

Страница 8: ...e Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proceeding to next step Concrete is to be wet concrete with minimum 25 MPA concrete footing work Pour wet concrete in the wooden support frame Figure 7 Concrete footing work ...

Страница 9: ...layground Equipment 8 Remove Wood Support Frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frame and replace soil in area around footing to subgrade level Figure 8 Remove wood support frame ...

Страница 10: ...MODEL NO GS W803 GSWeb Playground Equipment 9 Post Plate Assembly Figure 9 concreted block clean threads of L anchor bolts Figure 10 Attach post plate to footing with flat washer locking washer and nut Post plate ...

Страница 11: ...round Equipment 10 Pipe Assembly 1 It is strongly recommended that 3 4 workers lift the net into place Figure 11 Lower Pipe assembly M22 NUT WASHER Pipe Connector 3 Pipe Connector 2 Pipe Connector 2 Figure 12 Pipe Pipe Connector assembly 1 ...

Страница 12: ... W803 GSWeb Playground Equipment 11 Pipe Assembly 2 Figure 15 Middle Pipe assembly 2 Figure 14 Pipe Pipe Connector assembly 2 Pipe Connector 2 Figure 13 Middle Pipe assembly 3 Pipe Connector 1 M22 NUT WASHER M22 NUT WASHER ...

Страница 13: ...803 GSWeb Playground Equipment 12 Attaching Connector Cap to Connector Figure 16 Attaching Shackle Connector to Connector Figure 17 Middle Shackle Connector assembly Shackle Connector M22 Nut Washer 3 4 Shackle Pipe Connector ...

Страница 14: ...sembly Figure 18 Cable Assembly STEP 1 Cable Assembly After successfully preparing the net and post assembly attach cable with 3 4 Shackle to Connector as shown in figure 24 25 STEP 1 STEP 2 STEP 3 STEP 2 Figure 19 Middle cable loop assembly STEP 3 Shackle Connector ...

Страница 15: ...ent 14 Attaching Connector Cap to Connector Figure 20 Attach connector cap to connector Connector cap Figure 21 Connector cap Assembly Shackle Connector Connector cap Shackle Connector Pipe Connector 1 Pipe Connector 3 Pipe Connector 2 Pipe Connector 2 ...

Страница 16: ...It is also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA and TUV maintance system After Net structure tension is completed the net will stretch slightly over the first four weeks of use Following this initial period the net needs to be fully re...

Страница 17: ...ground Equipment 16 PARTS LIST 1 pipe connector 1 2 pipe connector 2 3 pipe connector 3 4 steel pipe 5 net 6 connector cap 7 3 4 shackle 8 shackle connector 9 M22 nut washer 10 post plate 11 L anchor bolt nut washer 1 10 9 3 6 2 7 8 11 4 5 ...

Страница 18: ...eb Playground Equipment 17 Maintenance Installation A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension will assist in the durability of the product ...

Страница 19: ...ould be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired and released for use access by the public should be prevented Information about accidents brought to the at...

Страница 20: ...enance of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Corrective maintenance Corrective maintenance should include measures to correct defects or th re establish th...

Отзывы: