ENGINE AND TRANSAXLE ASSEMBLY
EMA -21
INSTALLATION
EAD5D6B1
Installation is in the reverse order of removal.
Perform the following :
•
Adjust the shift cable.
•
Refill the engine with engine oil.
•
Refill the transaxle with fluid.
•
Refill the radiator with engine coolant.
•
Bleed air from the cooling system with the heater
valve open.
•
Clean the battery posts and cable terminals with
sandpaper assemble them, then apply grease to
prevent corrosion.
•
Inspect for fuel leakage.
After assembling the fuel line, turn on the ignition
switch (do not operate the starter) so that the fuel
pump runs for approximately two seconds and fuel
line pressurizes.
Repeat this operation two or three times, then check
for fuel leakage at any point in the fuel line.
www.CarGarage.ir
www.CarGarage.ir
www.CarGarage.ir