Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
RoomScape
®
Residence Hall Furniture - Board Deck Frame
Assembly Instructions
Board Deck Bed End Frame
Assembly - Bunk & Loft Beds
Note:
Loft and bunk bed assemblies
require a stacked pair of end frames
at each end. Single bed assemblies
(page 5) require one end frame at
each end with top caps and base
glides installed as described below.
Important:
Board deck loft beds do
not require installation of the
anti-racking bar, although it is
an option (Figure 2 below). If
installation is desired, see page 10,
steps 3 and 4.
1. If bed layout plan includes a stacked
pair of end frames (as with a bunk or
loft bed), first insert a pair of base
glides (with hole in center) to the
bottom of the lower bed frame. Next,
orient stacking devices as illustrated
and insert each into the top of that
lower frame. Use a weighted rubber
mallet to tap the stacking devices in,
seating them properly (Figure 1).
2. Place the second, upper end frame
onto the stacking devices of the
lower end frame and press down
evenly to begin seating both frames
together on the stacking devices. Use
a weighted rubber mallet, tapping a
little on each upper frame upright,
as required to properly seat two
frame sections together completely
(Figure 1).
3. Place a top cap onto each upright
of the top frame. Repeat above
procedures for second frame
(Figure 1).
Board Deck Loft Bed - Side Rails
& Lower Reinforcement Assembly
4. Holding one end frame assembly
in the upright position, correctly
orient and engage hooks of one side
rail to the top of the frame at the
desired height. Do so by sliding the
interlock bracket (with hooks facing
downward) into mounting slot in
the end frame. Press down and/or
tap with a weighted rubber mallet to
secure. Repeat procedure with end
frame at other end of assembly to
connect frames. Install the second
side rail in the same manner, making
sure both rails are at the same
height. As illustrated, install the
lower reinforcement similarly, near
the floor with finished side facing
inward (Figure 2).
Important:
Lower reinforcement
installation is required for loft bed
configurations, but is not required for
bunk bed installations.
Note:
To assemble Board Deck
Single, and Bunk beds, follow
instructions on pages 4 & 5, and
reference illustrations on page 3.
For Board Deck Loft Beds with
Megasurface see Page 6.
top cap
end frame
stacking
device
end frame
base glide
Figure 1
Figure 2
lower
reinforcement
side rail
end assembly
frame
anti-racking
bar
hand