14 Installation Note N5245-90109
Upgrade Kit Order Numbers: N5244AU-921 and N5245AU-921
-
“Step 24. Install the New Inner Cover.”
“Step 25. Reinstall the Outer Cover.”
“Step 26. Enable Option H29.”
“Step 27. Verify Option 028 is Not Installed.”
“Step 28. Perform Post-Upgrade Adjustments and Calibration.”
“Step 29. Prepare the PNA for the User.”
Step 1.Obtain a Keyword
Follow the instructions on the keyword Entitlement Certificate supplied to
obtain a keyword for installation of this upgrade.
Once the keyword has been obtained, you can proceed with the installation.
Step 2.Remove the Outer Cover
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
1
.
Step 3.Remove the Inner Cover
For instructions, click the Chapter 7 bookmark “Removing the Covers” in the
PDF Service Guide
. This inner cover may be discarded since it will be replaced
later.
Step 4.Remove the Front Panel Assembly
For instructions, click the Chapter 7 bookmark “Removing and Replacing the
Front Panel Assembly” in the PDF Service Guide
1. See