![Keysight Technologies S9100A Скачать руководство пользователя страница 82](http://html1.mh-extra.com/html/keysight-technologies/s9100a/s9100a_startup-manual_1962403082.webp)
7 Run Power Calibration
7. 3. 4. 2 Calibration 2 of 2: Power from RRH 1 RFHD 2 -> RRH 1 RFHD 1
This calibration is used to calibrate FR2 ports
(with
RF Tx/Rx 2
➁
used as the RF Output) on an
S9100A Option RH1 5G Multi-Band Vector Transceiver.
When performing this Power Calibration, the Source (Tx) output
power level is set to -5 dBm by default.
1. Calibrate the Source (Tx) signal path
a. Select the Power Calibration tab.
b. Select the Operation drop-down arrow and select
Calibration
.
c. Select the Calibration Step(s) drop-down arrow and select
Complete
.
d. Select the Port Selection drop-down arrow and
select
RRH 1 RFHD 2 -> RRH 1 RFHD 1
.
e. Select
Start the calibration
and follow the prompts.
f. Connect the U8487A Power Sensor or equivalent to
M1740A mmWave Transceiver connector
RF Tx/Rx 2
➁
.
g. Select
Ok
to continue the calibration.
View the
Results Source
tab when the calibration is complete.
Corrections are stored in:
S9100ID_<SerialNumber>-
Tx-RFIO_2-CHANNELPOWER.csv
78
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
Содержание S9100A
Страница 1: ...Startup Guide S9100A 5G Multi Band Vector Transceiver...
Страница 6: ...2 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 40: ...36 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 52: ...48 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 54: ...50 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 93: ...7 Run Power Calibration S9100A 5G Multi Band Vector Transceiver Startup Guide 89...
Страница 94: ...90 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 105: ...S9100A 5G Multi Band Vector Transceiver Startup Guide 101...