7 Run Power Calibration
7. 3. 2 Using X-Apps to Perform Alignments
All alignments must be performed before Power Calibration.
1. If it is not already running, start the Modular TRX interface:
The Modular TRX interface can be started as follows:
Select the
Start
menu (lower-left corner icon)
> Scroll down to "
K
" applications
> Select the
Keysight Modular Transceiver
drop-down arrow
> Scroll down the list and select
LaunchModularTRX
2. Select the settings icon (top right corner of the display).
3. Select Alignments (all alignments must be performed before calibrations).
a. Select Align Now All.
b. Select Align IF Cable.
74
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
Содержание S9100A
Страница 1: ...Startup Guide S9100A 5G Multi Band Vector Transceiver...
Страница 6: ...2 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 40: ...36 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 52: ...48 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 54: ...50 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 93: ...7 Run Power Calibration S9100A 5G Multi Band Vector Transceiver Startup Guide 89...
Страница 94: ...90 S9100A 5G Multi Band Vector Transceiver Startup Guide...
Страница 105: ...S9100A 5G Multi Band Vector Transceiver Startup Guide 101...