46
Keysight N5991 SATA Test Automation Software Platform User Guide
5
Receiver Tests
Common Parameters for Receiver Tests
Table 6
Common parameters for receiver tests
Parameter name
Parameter Description
Data Generator
Number of aligns in Framed
COMP pattern
This is the number of ALIGN primitives in each ALIGN block in the test pattern used for receiver tests. This setting has
no effect on the part of the training sequence before the looped test pattern.
Error Detector
Recovery Time
This is the interval after the loopback training or signal stress changing during which the DUT is allowed to
settle/recover. Errors during this time are ignored.
Use full Auto Align
This parameter controls how centering the sample point in the error detector is done. If it is “true” a full AutoAlign is
used. If it is “false” TimeCenter is used instead. TimeCenter is a lot faster than AutoAlign, but AutoAlign is better at
compensating for non-ideal DUT transmitter signals.
BIST Training
Force Retraining
When this parameter is “true”, a new loopback training is always done when the SJ frequency is changed.
Pause Before Auto-Align
Set to “true” to pause the execution of the procedure when the DUT is in loopback mode. It allows manual
optimization of the loopback parameters.
Power Cycle Mode
Controls when a power cycle is performed or requested from the user.
•
Always: Apower cycle is done before every attempt to train the DUT into loopback.
•
OnlyOnRetry: During first try, loopback training is done without a power cycle, and a power cycle is performed only
if that did not work.
•
Never: no power cycles will be performed or requested.
•
Loopback Training Max Retries: The maximum number of retries to train the DUT into loopback mode.
•
BIST Activation Sequence: This parameter displays the BIST sequence type selected using the sequence
drop-down menu in the Edit Parameters window.
Power Switch Automation
Use Power Switch
Automation
This parameter controls if a remote controllable power switch is used for power cycling the DUT. If it is “false”, all
following parameters (Power Switch Channel Number, Off-On Delay, Settling Time) are disabled.
Power Switch Channel
Number
This sets the channel number of the power switch channel that is connected to the DUT.
Power Cycle Off-On Delay
This is the duration between turning the DUT off and then turning it on again.
Power Cycle Settling Time
This is the wait time after the DUT is turned on and before the test continues with loopback training.
Содержание N5991ST3A SATA
Страница 1: ...User Guide Keysight N5991ST3A SATA Test Automation Software Platform...
Страница 5: ...N5991 SATA Test Automation Software Platform User Guide 1 Introduction Overview 6 Document History 7...
Страница 8: ...8 Keysight N5991 SATA Test Automation Software Platform User Guide 1 Introduction...
Страница 80: ...80 Keysight N5991 SATA Test Automation Software Platform User Guide 5 Receiver Tests...
Страница 81: ...Keysight N5991 SATA Test Automation Software Platform User Guide 81...
Страница 82: ...This information is subject to change without notice Keysight Technologies 2021 Edition 2 0 October 2021...