Service Information
2-
Measure the SRC1 & SRC2 RF Paths
The following procedure verifies SRC1 and SRC2 internal cables between the
front and rear panels.
Prepare the PNA to measure S12 with a normalization calibration using a
frequency range of 8 to 20 GHz and a power level of
−
8 dBm. See
Normalization Calibration” on page
. The cable on PNA Port 2 must
be long enough to reach the rear panel of the test set.
1.
Remove the SRC1 RF IN to SRC1 RF OUT rear panel jumper.
2.
Connect the PNA RF Port 1 to SRC1 RF IN on the front panel.
3.
Connect Port 2 to the rear panel SRC1 RF OUT.
4.
The maximum loss should be < 2.5 dB.
5.
Repeat the steps above with appropriate modification to measure the
SRC2 path, the maximum loss should be < 2.5 dB.
Measure RF OUT (Gain and Power)
The following procedure measures gain.
Prepare the PNA to measure S12 with a normalization calibration. Refer to
“PNA Normalization Calibration” on page
. Use a frequency range of 8 to 20
GHz and a power level of 2 dBm.
1.
Re-install the SRC1 RF IN to SRC1 RF OUT and the SRC2 RF IN to SRC2 RF
OUT rear panel jumpers.
2.
Connect PNA Port 2
cable
to SRC1 RF IN on the front panel.
3.
Connect the PNA Port 1
cable
to the Test Set Port 1 RF OUT.
4.
Issue the Test Set I/O commands 32,0 and 0,1 (enable ALC and output to
Port 1). Verify that the gain is greater than 10 dB at all frequencies and
there are no holes or significant discontinuities in the trace. Refer to
5.
Issue the Test Set I/O command 32,1 (disable ALC on Port 1). Verify that
the gain increases at all frequencies and that there are no holes in the
trace. Refer to
6.
Repeat the previous the previous four steps for each of the remaining test
set ports using appropriate SRC1/2 connections and appropriate Test Set
I/O commands.
The following procedure measures the power output level.
1.
Select [Sweep] > Sweep Type > CW Time. Set the sweep time to
10
seconds.
2.
Connect PNA Port 2 cable to the
p
ower
s
ensor.
Keysight N5261/62A User’s & Service Guide
73
Содержание N5261A
Страница 1: ...User s and Service Guide Keysight Technologies N5261A and N5262A Millimeter Head Controller...
Страница 6: ......
Страница 7: ...Keysight N5261 62A User s Service Guide 1 Installation System Operation...
Страница 51: ...Keysight N5261 62A User s Service Guide 45 Installation System Operation Figure 1 30 Uncalibrated S12 and S21...
Страница 54: ...48 Keysight N5261 62A User s Service Guide...
Страница 55: ...Keysight N5261 62A User s Service Guide 49 Service Information...
Страница 63: ...Service Information 2 Figure 2 8 Sloped Attenuator Cable Assembly Keysight N5261 62A User s Service Guide 57...