![Keysight Technologies N5261A Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/keysight-technologies/n5261a/n5261a_users-and-service-manual_1961871050.webp)
44
Keysight N5261/62A User’s & Service Guide
Installation & System Operation
1-
Figure 1-29
Banded
System Check
5.
Measure a Thru Connection.
a.
Connect the Port 1 to Port 2 module, and Port 3 to Port 4 module
(N5262A) to form thru connections.
b.
Delete the trace 1, S11. Select Trace/Chan > Trace > Delete Trace.
c.
Select [Preset] > Trace/Chan >Trace > New Trace. Select S12, S21,
S34 and S43. This test confirms that the modules are sourcing and
receiving. Refer to your millimeter-wave modules data from OML or
VDI, included with the your module.
S12 requires a Transmission/Reflection module on Port 1.
S21 requires a Transmission/Reflection module on Port 2.
S34 requires a Transmission/Reflection module on Port 3.
S43 requires a Transmission/Reflection module on Port 4.
Содержание N5261A
Страница 1: ...User s and Service Guide Keysight Technologies N5261A and N5262A Millimeter Head Controller...
Страница 6: ......
Страница 7: ...Keysight N5261 62A User s Service Guide 1 Installation System Operation...
Страница 51: ...Keysight N5261 62A User s Service Guide 45 Installation System Operation Figure 1 30 Uncalibrated S12 and S21...
Страница 54: ...48 Keysight N5261 62A User s Service Guide...
Страница 55: ...Keysight N5261 62A User s Service Guide 49 Service Information...
Страница 63: ...Service Information 2 Figure 2 8 Sloped Attenuator Cable Assembly Keysight N5261 62A User s Service Guide 57...