Troubleshooting Guide
4
Keysight N1911A/1912A Service Guide
53
ChB peak path
Verifies that the peak path of
channel B is working
(Note: This does not prove that
the peak path meets its
specifications)
Replace the DAP assembly for
channel B to see if this clears
the fault
DAP assembly, channel B (low
probability)
Main board (high probability)
ChB CW path
Verifies that the average path
of channel B is working
(Note: This does not prove that
the average path meets its
specifications)
Not applicable
Main board
ChB DAP check
Executes an internal self-test
procedure on the DAP
assembly for channel B
Replace the DAP assembly for
channel B to see if this clears
the fault
DAP assembly, channel B (high
probability)
Main board (low probability)
Instrument
Purpose
Debug tips
Possible faults
Содержание N1911A
Страница 1: ...Keysight N1911A 1912A P Series Power Meters Service Guide ...
Страница 16: ...16 Keysight N1911A 1912A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 40: ...2 Performance Tests 40 Keysight N1911A 1912A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 48: ...3 Theory of Operation 48 Keysight N1911A 1912A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 120: ...6 Contacting Keysight Technologies 120 Keysight N1911A 1912A Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...