27
15. Hand-over certificate
Handover certificate
(copy for the company carrying out the installation)
❏
The initial operation and instruction was carried out in the presence of the person authorised to perform the
acceptance and the system operator.
❏
The system operator/person authorised to perform the acceptance was informed about the obligation to ser-
vice the product according to the enclosed operating instructions.
❏
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and per-
son responsible for initial operation.
Place, date
Signature of person
Signature of system operator
Signature of the company
authorised to perform acceptance
carrying out the installation work
Содержание SE M NS 10
Страница 14: ...6 Explosio 1a 1b 1c 3a 3b 4a 4b 3c 5a 2a 2b 2c 6a 9a 9b 9c 9d 2f 2e 2d 1 1a 1 1b 1 1c 1 1d 14...
Страница 17: ...17 7 Control unit...
Страница 24: ...24...