background image

10

4.1 Control unit settings

4.1.1 General

The following functions are controlled by the control unit:

- Rinsing (Euro Norm grease separators do not have the rin-

sing function.)

- Heating

- Mixing

These functions are automatically started and ended accor-

ding to the programmed settings. The system’s components

can also be operated manually by using the control unit (See

Menu 2.1)

4.1.2 Programming the functions

The time of day, date and disposal program has been factory
set.

4.2 Operation

The control unit has a ‘Start’ and ‘Stop’ button (5) for ma-

nually controlling the disposal and a button for acknowled-

ging any alarms (3). The current operating status of the se-

parator is displayed by an LED (1), an alarm / malfunction

LED (2) and a function LED (4). The control unit can be ope-

rated by using the ‘Up

’, ‘Down

’, ‘ESC’ and ‘OK’ buttons (7).

Please follow the operating manual (8). Before conducting

any work on the control unit be sure to disconnect it from its

power source (9) (see safety instructions).

4.3

Functions / Steps of the disposal procedure

The control unit is set up for automated or manual operation.

Manual operation has the priority over automated operation. If

manual operation is activated, the automated operation is de-

activated (internally set automated procedures will not start!)

Note:

For proper disposal of collected grease, the heating fun-

ction should be  run for at least 2 hours before disposal. During

the last minute of heating, the mixing motor should also run.

If  the  automated  heating  times  are  changed,  the  mixing

times should be changed accordingly.

4.4 Setting parameters

Note: 

When programming the heating / mixing times be sure

that no times run into the next day. For example if heating
begins at 22:00 it should end at 23:59.

Setting the heating times

In  Menu  Section  3.1.1  the  day  on  which  heating  should
occur can be set. Also here the starting time of the heating
and the duration of the heating can be set.

Setting the mixing function

Note: When programming the heating / mixing times be sure that

no times run into the next day. For example if heating begins at

22:00 it should end at 23:59.

Setting the rinsing function

In Menu 3.1.3 on the control unit the day of the week that rinsing

should take place can be set. Here you can also set the time of

day that the rinsing should begin and also the duration of the rin-

sing.

4. Operation

 

Operation – LED

 

Alarm-LED

 

Alarm – button

 

Pump operation – LED

 

START/STOP

 

Digital Display

 

Navigation buttons

‘Up/down’ + ‘ESC/OK’

  

Operating instructions

 

Disconnect  control  unit

from power

0 System info

1 Information

2 Maintenance

3 Settings

2.1 Manual operation

2.2 Automated operation

2.3 SDS (Self Diagnosis System)

2.4 Service dates

2.5 Activating the Remote Control

3. Settings

3.1 Parameters

3.1.1.1 Every day

3.1.1.2 Monday

3.1.1.8 Sunday

3.1.1. ...........

3.1.1 Heating

3. Settings

3.1 Parameters

3.1.2 Duration

3.1.2 Mixing

3. Settings

3.1 Parameters

3.1.3.1 Every day

3.1.3.2 Monday

3.1.3.3 ..........

3.1.3.8 Sunday

3.1.3 Rinsing

Содержание SE M NS 10

Страница 1: ...dling Frequent disposal of freshly collected grease and sludge into connected storage tanks even during separator operation Separate disposal collec tion of grease and sludge Smooth wax like surface p...

Страница 2: ...ot to be climbed on as a means of reaching other installations Use separate ladders etc for this purpose Because of the possible formation of bio gasses SMOKING IS PROHIBITED while the separator is op...

Страница 3: ...lacement parts Page 21 10 Maintenance and servicing checks Page 22 11 Maintenance instructions for SE separators Page 22 12 Warranty Page 23 13 Declaration of Conformity Page 24 14 Manufacturer Separa...

Страница 4: ...te is its method of disposal While conventional separators must be emptied completely and shut down while this work is carried out in the case of the SE only the ma terial which has been separated out...

Страница 5: ...d is later drained into the collection and transport barrels Disposal of the material in closed barrels is achieved with almost no smell When changing the barrels there may be a temporary release of o...

Страница 6: ...0 4100 4600 Separator in Liter 2950 l 3650 l 4350 l NS NS 15 NS 20 NS 25 b1 1650 1750 1850 x Dimensions Weight in kg 97 128 186 192 Art Nr 93202 00 SE1 CNS 93204 00 SE1 CNS 93207 00 SE1 CNS 93210 00 S...

Страница 7: ...der This can be altered on site See as sembly instructions Assemble the plant components using the connection elements supplied with the equipment Screw the tanks together using a maximum torque of 7...

Страница 8: ...tor ventilation Ventilation pipes should be connected directly to outdoor ambient air roof The venti lation pipes should not be connected to one another 2 3 Control unit mounting The main power switch...

Страница 9: ...the operation of the separator Grease separator disposal company 2 Preparation for the hand over and initial training All sanitary connections must be complete Completely filling the separator with c...

Страница 10: ...before disposal During the last minute of heating the mixing motor should also run If the automated heating times are changed the mixing times should be changed accordingly 4 4 Setting parameters Note...

Страница 11: ...ow sludge transfer can cause the grea se separator area to be pumped out Automatic rinsing Automatic rinsing is triggered via a time switch For this rea son leave the valve on the rinsing line 1c open...

Страница 12: ...drainage will have enough room in the collection tank and place onto the empty barrel and connect Place the closed cover onto the full collection barrel and se cure properly Mark the barrel to identi...

Страница 13: ...h transparent hose and ventilation connection Ventilation connec tion port Drainage inlet Center of cover for inlet and ventilation Threaded cover for twist tigh tening Operational covers are custom d...

Страница 14: ...6 Explosio 1a 1b 1c 3a 3b 4a 4b 3c 5a 2a 2b 2c 6a 9a 9b 9c 9d 2f 2e 2d 1 1a 1 1b 1 1c 1 1d 14...

Страница 15: ...ase separator Tank seal gasket Heating dome Grease discharge valve Mixer Grease discharge cover Cover seal gasket Compensation tank Ventilation pipe Control unit Pump cables Heating dome cables Mixer...

Страница 16: ...replacement part number Danger symbol Protection category CE symbol Disposal information do not dispose of control unit in household trash Control unit hardware id The control unit ID sticker is loca...

Страница 17: ...17 7 Control unit...

Страница 18: ...ome 230 V single phase 50 Hz 1200 Watt Mixing motor 230 V single phase 50 Hz 180 Watt Rinsing motor 230 V single phase 50 HZ max 750 Watt Heating rod 230 V single phase 50 Hz max 1500 Watt IP 54 C 16...

Страница 19: ...the sludge trap tank Ensure that the sludge trap tank is filled to its upper edge with water Build up of layer of floating sludge layer Discharge floating sludge during each dispo sal Gradual build up...

Страница 20: ...per operating condition Install ventilation pipe or increase size of existing ventilation pipe Check barrels barrel covers and pipe connections to barrels Check all hoses and hose connections Remove f...

Страница 21: ...F Lifting Station KESSEL offers various lifting stations which can be installed before or after the grease separator Please note that a twin pump lifting station should be installed after a grease sep...

Страница 22: ...anual The results of the general inspection should be documented Any irregularities defects or problems with the separator should also be documented and repaired immediately 11 Maintenance instruction...

Страница 23: ...rresponding norms regulations 2 Wear and tear on a product will not be considered a defect Problems with products resulting from improper installation handling or maintenance will also not be consider...

Страница 24: ...24...

Страница 25: ...ecked for watertightness to be sure that it is fully operational before leaving the factory Date Name of examiner Mat Description Mat No Order No Prod Date Ref No Material Weight EN Approval Dimension...

Страница 26: ...plumbing company __________________________________________________________ Address __________________________________________________________ Telephone Fax __________________________________________...

Страница 27: ...operating instructions Initial operation and instruction were not carried out The client person responsible for initial operation was handed the following components and or product components Initial...

Страница 28: ...ifting Stations and pumps K Drains and shower channels K Separators Grease Separators Oil Fuel Coalescence Separators Starch Separators Sediment Separators K Septic Systems K Inspection Chambers K Rai...

Отзывы: