4. Installation and assembly

l

Inlet pipe

The inlet pipe must be laid at a gradient to the KESSEL lif-
ting station in accordance with DIN 1986 and be routed as
straight as possible.
Connection to the tank can be carried out as described under
section I or II above.
The ventilation pipe sets up pressure compensation to the
fresh air for the air flowing into or out of the system during
emptying or filling. According to DIN 1986 it must be laid at
least as size DN 70 for these lifting stations, and must be rou-
ted over the roof to avoid odour pollution.
Connection to the tank can be carried out as described under
section I or II above.

l

Pressure pipe

The pressure pipe for directing the soiled water into the se-
wage system must be connected directly to the respective
pressure pipe connection. According to the regulations of EN
12056, the pressure pipe must be routed above the back-
water level and connected to a ventilated basic or collecting
pipe.
The rubber hose included in the scope must be pushed about
4  cm  over  the  pressure  connecting  piece  at  the  pressure
connection and fixed in place using a hose clamp as a means
of acoustic insulation and to prevent transmission of forces.
Connection of the rubber hose is not an interlocking connec-
tion. It must be set up on site using brackets.
The pressure pipe must be connected (see above) in such a
way that no forces are transferred to the system and there is
no direct contact with the building (structure-borne noise). No
other draining elements may be connected to the pressure
pipe.
Air-tightness  and  material  strength  must  be  guaranteed
under pressure load, too. This must be checked during initi-
al operation.
The pressure pipe must not be connected firmly to the buil-
ding to prevent pressure blows. When cast metal or steel
pressure pipes with low absorption properties are used, a
pressure blow muffler must be included in the pressure pipe
from pumping heights from 5 m.
Backwater flaps to avoid pressure blows for installation in the

IMPORTANT

In the case of all the connections drilled at the side it must
be remembered that the level control is adjusted in such
a way that during normal operation the water level in the
container only reaches up to or just below the lower edge
of the moulded inlet pipe connecting piece on the side.
For this reason, a respective water level will result in all
pipes that are connected lower down. In the case of inlet
pipes this means that dirt deposits cannot be excluded
and may lead to the pipe becoming blocked in extreme
cases.

pressure pipe are available as accessories:
DN 80 backwater flap made of cast iron (art. no.: 206-199)
DN 100 backwater flap made of cast iron (art. no.: 206-198)
Aerating device (art. no. 206)
A shut-off valve must be installed in the pressure pipe on site
in accordance with EN 12056. For this, we recommend the
non-return valves for mono systems (art. no. 28683) and for
duo systems (art. no. 28694) from the KESSEL range of ac-
cessories.

4.3. Level measurement

4.3.1 Systems from model year 01/2010

Level measurement takes place using pressure sensor and
submersible pipe. The transparent air hose must always be
routed rising to the switch unit so that no condensation can
collect in the air hose.
Perfect function is only guaranteed when permanent pres-
sure compensation takes place between the switch unit and
lifting station. Excess air hose lengths must be shortened.
Extensions of the air hose up to 20 m are possible.
The switching levels are pre-set and can be changed using
the switch unit. More detailed information is available from
KESSEL Customer Services.

4.3.2 Systems up to model year 01/2010

Level  measurement  is  carried  out  using  a  pressure  dia-
phragm switch that is connected to the switch unit via an el-
ectric cable inc. air hose. Contact KESSEL Customer Servi-
ces for information about setting the switching level.

CAUTION:

Before  commencing  any  work  on  the  switchgear,  the
pump or the level control, the master switch and cut-outs
must  be  switched  off  and  secured  against  being  re-
connected.

Содержание Aqualift F Standard

Страница 1: ...o Product advantages Simple connection through moulded connecting pieces Drilling surfaces for further connections Fully automatic operation Maintenance friendly PE tank General technical approval no...

Страница 2: ...chgear and the level control are under voltage and may not be opened Only electricians may work on the electrical equipment The term electrician is defined in the VDE 0105 Steps must be taken to ensur...

Страница 3: ...ise level is created that may be a nuisance depending on how the pump is installed If there are maximum noise level stipulations that need to be observed appropriate mea sures need to be taken The sou...

Страница 4: ...6 3 Operating the switch unit Page 18 6 4 Functional description Page 19 6 5 Functional test Page 19 7 Inspection and maintenance 7 1 Notes on the pump Page 20 7 2 Notes on aeration device Page 20 7...

Страница 5: ...entilation pipes at least DN 70 Wearing media must be kept away from the pump im peller The systems are suitable for constant wastewater tempera tures up to 35 C A maximum temperature of 60 C is per m...

Страница 6: ...100 order no 28647 28649 with non return valve DN100 110 DN70 75 DN32 40 DN100 110 475 Zulaufh he 180 3 1 2 Twin system 1 1 kW with pressure outlet DN 100 order no 28652 28659 with non return valve Tw...

Страница 7: ...g 7 x 1 5 mm2 Temperature of material pumped 35 C Weight pump 30 kg 31 kg Protective rating IP 68 24h 3m WS Operating mode S1 S3 Max period of perm operation 240 Min 30 duty cycler Sound level 70 db 7...

Страница 8: ...uit TF1 and TF2 b Up to model year 01 10 Level inputs each 15 8 V input approx 5 mA circuit TF or TF1 and TF2 and E7 or E7 and E8 for connecting the temperatu re switch of the pump motor sensor supply...

Страница 9: ...e system Such dama ge is not covered by the warranty 4 1 Fitting the collecting tank Umaintenance work on the lifting stations they must always be installed in such a way that there is sufficient acce...

Страница 10: ...out using connection clamps or rubber hoses with hose clamps To prevent the high tension forces leading to deformation at the connecting piece a suitable supporting ring must be pus hed into the upper...

Страница 11: ...pumping heights from 5 m Backwater flaps to avoid pressure blows for installation in the IMPORTANT In the case of all the connections drilled at the side it must be remembered that the level control i...

Страница 12: ...nected cables must be strain relieved Screw connections not used must always be sealed properly CAUTION Only qualified electricians may carry out the work on el ectrical equipment described below Befo...

Страница 13: ...d on the right at TF input wire 5 on the left at TF input Input E7 The jumper must be left Level inputs ON ALARM The cable must always be routed rising to the switch unit The cable ends of the pressur...

Страница 14: ...of the relays is prin ted on the board It means malfunction and alarm message is switched on The relay contacts do not have any internal connection to any kind of supply or operating voltages of the...

Страница 15: ...be left Input E8 The jumper must be left Level inputs ON ALARM The cable must always be routed rising to the switch unit The cable ends of the pressure level switch must be connected to the respectiv...

Страница 16: ...ot be used to switch different pha ses The phase may deviate from L1 however The malfunction and warning messages are issued via a relay changeover contact without protective circuit Inductive loads m...

Страница 17: ...off Anti blocking function off OFF up to year 12 09 5 6 Configuration of switch unit up to model year 12 09 Configuration of the control is carried out in the factory using switches S601 S604 between...

Страница 18: ...ch as metal sand etc Before initial operation the pump must be filled with pumping fluid up to the height of the ventilation bore hole of the pump housing The pump must not suck in any air After the c...

Страница 19: ...e other pump is switched on Parallel operation As the soiled water level rises in the tank the level switch on 1 closes After the on 1 switched has closed the switch on delay time begins see section 5...

Страница 20: ...return valve for function if appropriate The backwater flap must be replaced after 2 years of ope ration 7 1 Notes on the pump The pump should be checked at regular intervals If opera tional noises in...

Страница 21: ...the same type The contactor is a wearing part and should be checked and changed if necessary once a year if possible When chan ging the batteries make sure you dispose of them properly with the envir...

Страница 22: ...ed Too little pumping capacity Aeration device not in operating position Wrong direction of rotation for motor In the case of twin systems both motors are rotating the wrong way Reduced capacity throu...

Страница 23: ...ilar Backwater flap faulty wastewater runs out of the pressure pipe back into the system Foam formation in the system Tank or pumps are blocked by grease being discharged in large quantities Level con...

Страница 24: ...ust be acknowledged using the alarm key In the case of lifting stations jumper TF2 faulty not installed Replace install jumper Motor fault Duo Pump 1 Duo Pump 2 Running time limit fault running freque...

Страница 25: ...eck the air hose for leaks Rotary field phase fault Rotary field fault Wrong rotary field for mains connection of switch unit Swap 2 phases Phase fault Phase L1 or L2 L3 not available Check connection...

Страница 26: ...ing excee ded If the alarm level is exceeded both pumps switch on If the level drops below the on 2 level the pumps switch off Non closing on 2 level switch Malfunction message follows the alarm level...

Страница 27: ...ndicates this 8 2 3 Malfunction message SMalfunction messages are sent through Activation of the malfunction relay and thus through the warning device connected to this Display of the type of malfunct...

Страница 28: ...zeige Automatikbetrieb Niveau Anzeige leuchtet Pumpniveau erreicht Pumpen Anzeige leuchtet Pumpe l uft Unterdr cken des akustischen Alarms mit Taste Ausschalten Handbet tigen der Pumpe mit Taste g g g...

Страница 29: ...lfunction Phase rotary field red Permanently lit Phase failure has display priority for information for the Flashing Rotary field fault fitter motor protection Motor protection switch red Motor protec...

Страница 30: ...elec trician must always be consulted The current set at the motor protection switch must corre spond with the rated current of the connected motor and must not be adjusted by the operator Following...

Страница 31: ...31 9 2 2 Switch unit for single system from model year 12 09 9 Control unit Edition 04 99 Du EINZ F...

Страница 32: ...ivated Pump 2 green Pump output 2 activated Malfunction Phase rotary field red Permanently lit Phase failure has display priority for information for the Flashing Rotary field fault fitter motor prote...

Страница 33: ...33 9 3 2 Switch unit for double system Aqualift Duo up to model year 12 09 9 Control unit Edition 04 99 Du DUO F...

Страница 34: ...5 850118 DN 150 850119 Saw cap DN 50 DN 150 50100 Battery 1 unit from model year 01 2010 197 081 Rechargeable battery up to model year 12 2009 20230 Non return valve for mono systems DN 100 28683 Non...

Страница 35: ...mersible pipe 6 1 206 018 Cleaning cover 7a up to 12 09 1 206 048 Mono switch unit 1 1 kW 7a up to 12 09 1 206 116 Mono switch unit 2 2 kW 7b up to 01 10 1 363 100 Mono switch unit 1 1 kW 7b up to 01...

Страница 36: ...7a up to 12 09 1 206 117 Duo switch unit 2 2 kW 400 V 7b from 01 10 1 363 117 Duo switch unit 1 1 kW 400 V 7b from 01 10 1 363 118 Duo switch unit 2 2 kW 400 V 8 1 28663 Pressure hose D 110 x 6 for DN...

Страница 37: ...ingle system 206 017 Pos Unit Part No Description 1 1 28045 Pressure control unit mono 2 1 206 014 Upper part of pressure control unit 3 1 206 045 Cable screw connection 4 5m 206 047 Cable 5 2 017 153...

Страница 38: ...N 100 part no 240 051 Pos Unit Part No Description 1 1 240 046 Flap housing 2 1 240 048 Hose connection 110 3 1 240 038 Hex locknut M8 4 1 240 037 O Ring 5a 1 240 068 Backwater flap for 1 1 kW inc fla...

Страница 39: ...09 T piece DN 100 4a 2 240 068 Backwater flap for 1 1 kW inc flap stay 4b 2 240 069 Backwater flap for 2 2 kW inc flap stay 6 4 240 027 O Ring 7 8 240 058 Hexagon safety screw M6 8 8 240 059 Hexagon s...

Страница 40: ...SEL products are warranted for a period of 24 month This warranty period be gins on the day the product is shipped form KESSEL to its cu stomer The warranty only applies to newly manufactured products...

Страница 41: ...41...

Страница 42: ...erating instructions Initial operation and instruction were not carried out The client person responsible for initial operation was handed the following components and or product components Initial op...

Страница 43: ...______________________________ Contracted plumbing company __________________________________________________________ Address __________________________________________________________ Telephone Fax _...

Страница 44: ...ifting Stations and pumps K Drains and shower channels K Separators Grease Separators Oil Fuel Coalescence Separators Starch Separators Sediment Separators K Septic Systems K Inspection Chambers K Rai...

Отзывы: