background image

Table of Contents 

1  Letter ...................................................................................................................... 3 

2  About this manual .................................................................................................  4 

2.1 

BEFORE COMMISSIONING

 ................................................................................................................................. 

NOTES ABOUT THIS MANUAL

 ....................................................................................................................................... 

3  Safety instructions for implements ..................................................................... 5 

3.1 

INTENDED USE

 ......................................................................................................................................................... 

3.2 

GENERAL SAFETY AND ACCIDENT PREVENTION RULES

 ............................................................... 

4  Disposal  .............................................................. 

errors! Bookmark not defined. 

5  Guarantee ............................................................ 

errors! Bookmark not defined. 

6  Recommendations .............................................. 

errors! Bookmark not defined. 

6.1 

LUBRICANTS

 ...................................................................................... 

ERRORS! TEXT MARK NOT DEFINED. 

6.2 

MAINTENANCE AND REPAIR FAULT

 ..................................... 

ERRORS! TEXT MARK NOT DEFINED. 

7  MOUNTING ........................................................................................................... 10 

7.1 

INSTALLING KM 13050-22550 M-ABR 50 AND KM 13050- 22550H-ABR 50 ......................... 10 

7.2 

INSTALLING A KM 13050- KM 22550 M-ABR 50 ..................................................................... 10 

7.3 

INSTALLING A KM 13050-22550 H-ABR 50 .............................................................................  12 

7.4 

MOUNTING DIRT MATERIAL CONTAINER

 ................................................................................................ 

12 

7.5 

MOUNTING SIDEBOOK

 ...................................................................................................................................... 

12 

7.6 

MOUNTING THE WATER PRESSING DEVICE

 ......................................................................................... 

14 

8  Operation ............................................................................................................. 15 

8.1 

OPERATING INSTRUCTIONS - SWEEPING MACHINE

........................................................................ 

15 

8.2 

DIRT COLLECTION SETTING

 .......................................................................................................................... 

15 

8.3 

SIDEBOOK SETTING

 ........................................................................................................................................... 

15 

9  Maintenance ........................................................................................................ 16 

9.1 

GENERAL

 .................................................................................................................................................................. 

16 

9.2 

MAINTENANCE

 ....................................................................................................................................................... 

16 

9.3 

DAILY TESTING

 ...................................................................................................................................................... 

16 

9.4 

MAINTENANCE AFTER 20 BZW. 100 HOURS OF OPERATION OR LONGER SERVICE TIME

 ............ 

16 

9.5 

INSTALLATION OF THE ROLLING GEAR

 ................................................................................................... 

16 

10  TECHNICAL DATA .............................................................................................. 17 

10.1 

KEHR MACHINE

 ................................................................................................................................................ 

17 

10.2 

DELIVERY SERIAL

 ........................................................................................................................................... 

17 

10.3 

OPTIONAL EQUIPMENT

 ................................................................................................................................ 

17 

11  EC Declaration of Conformity ............................................................................ 18 

Содержание KM 13050 H-ABR 50

Страница 1: ...R 50 KM 16550 H ABR 50 KM 19050 M ABR 50 KM 19050 H ABR 50 KM 22550 M ABR 50 KM 22550 H ABR 50 Roll diameter 50 cm for municipal tractors u Carrier vehicles from 18 kW Manufactures by Kersten Arealmas...

Страница 2: ...50 22550 M ABR 50 AND KM 13050 22550H ABR 50 10 7 2 INSTALLING A KM 13050 KM 22550 M ABR 50 10 7 3 INSTALLING A KM 13050 22550 H ABR 50 12 7 4 MOUNTING DIRT MATERIAL CONTAINER 12 7 5 MOUNTING SIDEBOOK...

Страница 3: ...e using this machine or implement for the first time please read this manual thoroughly and thoroughly If you do not understand any of the information contained in this safety data sheet or the produc...

Страница 4: ...ement for the first time The best way to familiarize yourself with its basic functions and its handling is to choose a free and level terrain for your first trip You reduce the risk of accidents on yo...

Страница 5: ...gulations 3 2 1 Basic rules In addition to the instructions in this operating manual observe the general valid safety and accident prevention regulations The implement must not be operated by persons...

Страница 6: ...te during the work assignment 3 2 4 During operation Never leave the control room while driving Do not leave the operating station until the brushes of the attachment come to a standstill Do not make...

Страница 7: ...gs turned parts grease nipples shaft seals wheel hubs etc After each cleaning with the high pressure cleaner the lubrication points must be re greased In case of infringement the right to guarantee ex...

Страница 8: ...operating instructions and safety instructions Never open or remove protective devices while the engine is running Follow the instructions in the technical manual Smudge Touch machine parts only when...

Страница 9: ...per operation in the event of no or incorrect maintenance work when using inadmissible equipment and when using non original spare parts 6 Recommendations 6 1 Lubricants For engine and gearbox use the...

Страница 10: ...s with wheels special accessories 7 2 Attachment of a KM 13050 KM 22550 M ABR 50 Depending on the tractor type the delivered PTO shaft may be too long In this case it must be shortened according to th...

Страница 11: ...cking pins on the outer forks 2 Slide the outer fork onto the PTO stub shaft 3 Release the locking pin 4 Move the PTO shaft back and forth until the locking pin clicks into place Image6 5 Hook the dri...

Страница 12: ...h the help of the locking pins and secure with clippings Hook in the hydraulic cylinder for the hydraulic tank emptying and with a Secure the folding pin Route the hydraulic hose towards the tractor T...

Страница 13: ...se between the control unit on the tank and the top of the pump To install the side brush arm screw the mounting plate to the right of the sump edge in the holes provided there Hook in the side brush...

Страница 14: ...in the sketch a Sweeper without collecting container b Sweeper with collecting container Jet Headers Headers Clippings Jet The distance between the two nozzles varies with the different working width...

Страница 15: ...edge have about 7 cm ground clearance Depending on the degree of wear of the sweeping roller the collecting container must be placed in the corresponding holes so that the setting dimensions 4 cm and...

Страница 16: ...ructions in the enclosed operating instructions of the cardan shaft manufacturer 9 3 Daily test Check the safety elements and moving parts for wear before each use Check the hydraulic connections and...

Страница 17: ...m 165 cm 190 cm 225 cm mechanical drive 50 50 50 50 50 hydraulic drive Sweeping roller diameter 10 2 Scope of delivery as standard Kom bic roller with poly twist trim five row Rubber splash flap Hydra...

Страница 18: ...mit allen einschl gigen Bestimmungen der fol genden EG Richtlinien Cette machine satisfait galement toutes les dispositions pertinentes des directives CE suivantes The machinery is also in compliance...

Страница 19: ...NOTE...

Страница 20: ...Distributed in UK by Kersten UK Ltd Tel 0118 986 9253 Progress House 39 Boulton Road Reading RG2 0NH www kerstenuk com info kerstenuk com...

Отзывы: