18
14 a.) Assemble the rail. Set the rails on a flat surface. The rails consist of two sections (standard
delivery). The sections are aligned and bolted together into a track for the carriage. Fit 5 trans-
verse log support but do not tighten the bolts yet. (see picture below)
b.) Assemble the log clamp (# 146). The log clamp is movable and can be place where appro-
priate.
c.) Install stop (# 132) at the end of the rail.
Содержание 21-SV500B
Страница 1: ...Read this manual carefully before using the product Translated from the original 21 SV500B SAWMILL...
Страница 12: ...12 Table of contents...
Страница 13: ...13 Table of contents 6 Mount the pawl 57 as shown below and mount the tension spring 57 1 2 3 4...
Страница 32: ...32 Table of contents BLUEPRINT I CARRIAGE...
Страница 33: ...33 Table of contents BLUEPRINT II SQUARE PROFILE BLUEPRINT III THE CARRIAGE FEET...
Страница 34: ...34 Table of contents BLUEPRINT V BAND WHEELS BLUEPRINT VI RAILS...